The Order Includes The Preparation Of Comprehensive Multi-Discipline Design Documentation Along With The Preparation And Obtaining Of A Document Authorizing The Commencement Of A Road Investment - The Zrid Decision In Accordance With The Act Of April 10, 2003 On Special Rules For The Preparation And Implementation Of Investments In The Field Of Public Roads. The Scope Of The Project Covered By The Design Includes:- Construction, Expansion And Reconstruction Of Roads, - Construction, Expansion And Reconstruction Of Intersections With Intersecting Roads, - Construction And Reconstruction Sidewalks And Construction Of Bicycle Paths (Pedestrian And Bicycle Routes), - Construction/Reconstruction Of Pedestrian Crossings And Crossings For Cyclists, - Construction/Reconstruction Of Exits Providing Access To Adjacent Areas, - Strengthening Of Existing Road Surfaces (If Possible Or Necessary), - Construction Bus Bays In Locations Resulting From Arrangements Made At The Design Stage And In The Location Of Existing Bus Stops, - Reconstruction And Construction Of Road Drainage Along With Water Drainage Solutions Rainfall And Snowmelt To Receivers, - Construction Of Road Culverts, - Construction Of Other Elements Resulting From The Obtained Administrative Decisions, - Construction Of Engineering Facilities If Necessary Resulting From The Topography Of The Area, Taking Into Account The Rationality Of The New Road Route, - Construction Of A Storm Sewage Network With Rainwater Drainage From The Designed Roads To The Existing Rainwater Drainage Systems, - Cutting Down The Existing Greenery To The Necessary Extent, - Planting Greenery (If Necessary), - Construction Of Acoustic Protection Elements (If Necessity), - Construction Of Road Sewage Treatment Devices Before Introducing Them Into Receivers (If Necessary), - Other Elements Resulting From The Environmental Decision, - Installation Of Road Traffic Safety Devices (Protective Barriers, Pedestrian Fences), - Installation Of Temporary And Permanent Fences (In If Necessary), - Construction Of Vertical And Horizontal Marking Elements, - Construction Of Road Lighting On The Designed Sections In Places Resulting From Technical Conditions, - Construction Of Lighting At Road Intersections Such As Roundabouts, - Reconstruction Of Lighting In Places Existing In The Necessary Scope, - Construction And Reconstruction Of Technical Infrastructure Facilities To The Necessary Extent, - Demolition Of Elements Colliding With The Investment In Question (Buildings, Road And Street Elements, Elements Of The Land Infrastructure Network, Elements Of Small Architecture And Fences, Gates And Wickets And Other Elements Colliding With The Investment).
|