1. The Subject Of The Order Is The Provision Of The Service Of Acting As A Contract Engineer Along With Multi-Discipline Investor Supervision For The Investment Called Rzepińskie Centrum Sportowe And Rzepińskie Centrum Sportowe - 2Nd Stage Co-Financed By The Government Fund Polish Order Strategic Investment Program.2.The Subject Of The Order Includes In Particular: 1) Performing The Function Of The Contract Engineer, I.E. Comprehensive Management Of The Implementation Of Two Separate Contracts For Construction Works And Their Coordination As One Investment Project, While Maintaining The Legal, Financial And Acceptance Separateness Of Each Of Them: A) Contract I - Rzepińskie Centrum Sportowe (Proceeding No. Rgkśi.271.1.2026.Ap) - Stage 1: Construction Of A Three-Story, A Multi-Functional Club Building Without A Basement With A Hotel Part (Including A Three-Lane Bowling Alley, Gym, Conference And Restaurant Zone, 15 Hotel Rooms, Two Elevators, Internal Installations, Connections Assigned To Stage 1), Implemented On A Turnkey Basis, With Exclusions Specified In The Documents Of This Order. B) Contract Ii - Rzepińskie Centrum Sportowe - Stage Ii (Proceeding No. Rgkśi.271.5.2026.Ap) - Stage 2.1: Land Development, Communication Infrastructure (Internal Roads, Parking Lots, Sidewalks, Retaining Walls) And Sports Infrastructure (Full-Size Training Pitch 64 × 100 M With Synthetic Grass And Covered Stands, Roller Rink), External Networks And Installations (Water And Sewage, Fire Protection, Gas, Electricity, Teletechnical), Fire Protection Tank With A Hydrophore Chamber And Retention Tanks, With The Exceptions Specified In The Documents Of This Order; - Implemented On Plots No. 7, 8/58 And 8/59 At Ul. Północna In Rzepin, Based On The Building Permit Decision No. 15/2026 Of January 19, 2026.2) Exercising Multi-Sectoral Investor Supervision Within The Meaning Of The Act Of July 7, 1994 - Construction Law Over The Works Covered By Contract I And Contract Ii, In The Following Specialties: Construction, Road, Sanitary, Electrical And Telecommunications, Together With The Coordination Of Activities Supervision Inspectors, Including Checking The Compliance Of The Works With The Design Documentation, Construction Permit, Regulations And Principles Of Technical Knowledge, Acceptance Of Works That Are Disappearing And Covered, As Well As Participation In Tests, Measurements And Acceptances; 3) Taking Over, Organizing And Analyzing The Complete Set Of Contract Documents For Both Contracts And Preparing An Opening Report, Containing In Particular A Scope Matrix And A Matrix Of Interfaces Between Contracts, A Risk Register, A Contract Management Plan And An Integrated Master Schedule; 4) Managing The Technical, Organizational, Time And Cost Interface Between Contract I And Contract Ii, Including Maintaining The Contact Register And Interface Cards, So That None Of The Contracts Blocks The Implementation And Acceptance Of The Other; 5) Controlling The Quality Of Constru
|