3 List Of Activities: 1) The Scope Of Construction Works Includes: A) Securing The Surface Of The Pitch Against Erecting Scaffolding, E.G. Osb Plates, B) Manual Unloading And Installation Of Point Scaffolding, C) Disassembly Of The Pitch Fence From The Polypropylene Mesh, D) Export And Disposal Of Materials From Demolition, E) Installation Around The Pitch Of The Steel Fence Mesh Coated Pvc In Ral 6005 (Green Color) Thickness 3.8 Mm, Square Mesh With A Size Of 55X55 Mm, F) Installation On The Fence (Along The Entire Width Of The Pitch) Behind The Gates Of The Football From The Polypropylene String Mesh, The Inactless 4 Mm Thickness, The Square Mesh Of 45X45 Mm In Ral 6005 (Green), G). Galvanized Thickness Min. 5 Mm Fastened Every 1 M, Use Galvanized Assembly Accessories (Roman Screws, Carabiners, Hooks, Pendants, Etc.), H) Cleaning The Construction Site, 2) The Scope Of Construction Works For The Replacement Of Monitoring Cameras: A) You Should Buy And Install The Following Installation Materials:- Monitoring Camera- Pcs. 3,- Switch Poe 4 Port. - Pcs. 1,- 4-Canal Network Recorder Ip + 6 Tb Disk- Set 1,- Ups Pops Ut2200e-Fr/Ups 2200 Va Cyberpower With Battery Battery- Set 1,- Auxiliary Materials (Utp 5E Cable, Connecting Cans, Handles, Etc.), Cameras Should Be Installed On The Columns Indicated By The Employer. One Pole Should Be Connected To Connecting The Camera. Remove The Existing Recorder, Switch, Power Supply, Cameras And Transfer To The Customer. Install A New Recorder With Disk, Switch, Ups Power Supply With Batteries, Start And Program The Whole, 3) The Scope Of Construction Works For The Replacement Of Lighting Fittings: A) Dismantling And Utilization Of Old Fittings From Existing Columns, (Metalhalogenic Luminaire) After 2 Pcs On A Pole 10 M 39900 Lm, 5700 K, Ip67 - Pcs The Astronomical Clock In The Time Compartments Specified By The Investor Is To Transfer The Power Supply To The Bistable Relay With The Exclusion Function After A Certain Time. Pressing The Button Causes The Devices To Be Switched On Or Turning Off The Output Clamps. The Control Impulse Must Be A Signal From The N Line. After Administration Of An Impulse, Which Will Attach The Lighting Through The Contactor And Then Waiting For The Set Time, There Is Automatically Switching Off, D) Foundation Of The Galvanized Post With Dimensions Of Min. 10X10x3 With A Foundation At The Ground At The Entrance To The Square. Installation Of A Button With High Mechanical Resistance, Degree Of Protection Min. Ip65 (Control Carried Out With Line N). Distance From The Switchgear About 15 M. Marking Of The Button And A Legible Description For The Pitch Users, E) Making A Pointless Signal Cable To Control The Relay Using The Button, F) Making The Necessary Connections And Providing The Necessary Materials For Proper Functioning, G) Making Electrical Measurements And As -Built Documentation, 4. A Detailed Determination Of The Subject Of The Contract Is Included In Annex 3 To Swz, I.E.: Descrip
|