1. The Subject Of The Contract Is To Exercise Investor Supervision Over The Construction Of The Amphitheater In The Spa Park Of The Gołdap Spa Along With The Emergency Installations: Water Supply, Sanitary Sewage, Rainwater Sewage System, Electricity And Land Development And Construction Of A Congress On Journal Of Laws No. 1986/6, 1981 Ob. Geode. Gołdap 1 In The Field Of Construction, Sanitary, Electrical And Road Industries. 2. The Scope Of Supervised Work Will Cover The Construction Of The Amphitheater For 498 Places (Including 400 Seats) Consisting Of The Following Parts: A Covered Audience With An Area Buildings 374.60M2, Scene With A Back Room Building With A Scene With An Area Of Buildings 355.10 M2 And A Volume Of 672.00 M3, Observation Deck, Communication Service (Exit, Internal Road, Fire Road, Paths, Pavements, Access And Commuting) Along With The Execution Of Sanitary, Water Supply, Electricity, Electricity And Storm Water Drainage Connections. 12-18, Specification Of Technical Execution And Acceptance Of Construction Works (Stwiorb) Constituting Annexes 19-23 To Swz. In Addition, Annexes No. 12A And 12B Are:- Decision No. Mg.83.2024 Of 29.11.2024- Building Permit- A Designer Statement On Introduced Changes In Relation To Design Solutions. The Documentation Is Also Available At Https://Ezamania.Gov.Pl/Mp-Client/Search/List/Ocds-148610-11947F4e-F563-4E2d-Bdb8-508809C6f91f 3. 1994 Construction Law And In Addition: A) Control Of The Compliance Of Construction Works In Technical, Material, Utility And Economic Terms With Design Documentation, Technical Specifications For The Implementation And Acceptance Of Works, Building Permits, With Technical And Construction Regulations, Standards And The Principles Of Technical Knowledge; B) Checking The Quality Of Completed Construction Works And Built -In Construction Products, In Particular Preventing The Use Of Products, And In Particular Preventing The Use Of Products Defective Construction, Not Allowed To Be Used In Construction; C) Coordination Of Works Of Individual Industries; D) Checking And Receipt Of Works Covering Or Disappearing, Participating In Rehearsals And Acceptance Of Installations, Technical Devices, And Preparation And Participation In The Activities Of Receipt Of Construction Works; E) Submitting Quarterly Reports On The State Of The Task And The Difficulties In Its Implementation (Reporting (Reporting Threats To Timely And Qualitative Completion Of Work); F) Confirmation Of Actually Completed Works And Removing Defects; G) Checking Documents Submitted By The Contractor For Partial Acceptance And Final Acceptance; H) Support When Carrying Out The Settlement Of Completed And Received Works, In Accordance With The Contract Concluded By The Contracting Authority With The Contractor; I) Confirmation Of Readiness To Accept Works, Performing Works In The Presence Contractors Of Works; J) Conducting Investor Supervision In The Event Of Additional Works On The Abovementioned Rules (A
|