Amc For Instrument Maintenance Work At Reep Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; AMC for Instrument Maintenance work at REEP; as per scope of work and BOQ-1 Laying, dressing, termination, ferruling of instrument cable (Power / signal) on cable tray / supports. Including & up to 2.5 Sq mm 7 core 2 Laying, dressing, termination, ferruling of instrument cable(Power / signal) on cable tray / supports. Above 7 core & Up to 2.5 sq. mm 24 core. 3 Fixing / replacement of Instrument cable tray (GI / FRP) with necessary support works. This includes bends, coupler plates, suitable fasteners & welding, cutting of supports / MS angles, fixing on walls etc. As directed by EIC. Size – 50 to 200 mm, perforated type,300 to 600 mm, ladder / perforated type. 4 Fabrication of M.S. PIPES / CS pipes (Seamless)/HDPE with necessary Jointing System with Flange, Nipple, Distribution header etc. This includes fixing the pipeline sizes as mentioned including cutting, joint welding 15 to 100 NB with 2 coat Epoxy Paint. 5 Fabrication of Frames/Structural Support/roof/cover for Installation of Instruments .This includes welding, cutting of supports / MS angles, fixing on walls. with 2 coat Epoxy Paint. 6 Fixing/Replacement/Handling of Instrument Control Valve and wiring and testing .size 15 to 150 mm Flanged/Threaded type. 7 Fixing/Replacement/Handling of Instrument Flow meter and wiring and testing .size 15 to 150 mm Flanged/Threaded type. 8 Fixing/Replacement/Handling of Instrument Level Sensor and wiring and testing .size 15 to 80 mm Flanged/Threaded type. 9 Fixing/Replacement/Handling of Instrument Pressure transmitter/guages and wiring and testing .size 15 to 80 mm Flanged /Threaded type. 10 Fixing/Replacement/Handling of Instrument RTD/Thermocouple/Thermowell, wiring and testing .size 300 to 2500 mm Length Flanged /Threaded type. 11 Fixing/Replacement/Handling of Digital Panel meter/PID controller/transmitter and wiring and testing .size 15 to 80 mm Flanged /Threaded type. 12 Fixing/Replacement/Handling of Solenoid Valve/Pneumatic Cylinder and wiring and testing Flanged /Threaded type. 13 Repair and testing of Instrument Control Valve.size 15 to 150 mm Flanged /Threaded type. 14 Repair and testing of Instrument Flow meter.size 15 to 150 mm Flanged /Threaded type. 15 Repair and testing of Instrument Level Sensor. size 15 to 80 mm Flanged /Threaded type. 16 Repair and testing of Instrument Pressure transmitter/guages .size 15 to 80 mm Flanged /Threaded type. 17 Repair and testing of Instrument RTD/Thermocouple/Thermowell.size 300 to 2500 mm Length Flanged /Threaded type. 18 Repair and testing of Digital Panel meter/PID controller/transmitter. size 15 to 80 mm Flanged /Threaded type. 19 Repair and testing of Solenoid Valve/Pneumatic Cylinder and wiring and testing Flanged /Threaded type. 20 Maintenance of UPS 6 KVA: Blowering and cleaning, dedusting of UPS. Checking Voltage and Earthing and terminal tightness of each components i.e MCB,I/O Terminals, Fuse etc. Checking the Voltage Restoring the normal working condition. Maintenance work to be carried out as per direction of EIC 21 Maintenance of UPS 20 KVA: Blowering and cleaning, dedusting of UPS. Checking Voltage and Earthing and terminal tightness of each components i.e MCB,I/O Terminals,Fuse etc. Checking the Voltage Restoring the normal working condition. Maintenance work to be carried out as per direction of EIC 22 Maintenance of Battery 92 Nos: Blowering and cleaning, dedusting of UPS. Checking Voltage and Earthing and terminal tightness of each components i.e MCB,I/O Terminals, Fuse etc. Check the Voltage of the Each Battery with final output reading .Replacing the faulty component like MCB,I/O Terminals,Fuse,Battery. Checking the Voltage Restoring the normal working condition. Maintenance work to be carried out as per direction of EIC. 23 Maintenance of PLC: Blowering and cleaning, dedusting of PLC.Checking Voltage and Earthing and terminal tightness of each components i.e. MCB,I/O Terminals,Fuse,PLC Modules, I/O Modules. Repair/Replacing the faulty component like MCB,I/O Terminals,Fuse,PLC Modules, I/O Modules/ wiring. Maintenance work to be carried out as per direction of EIC . 24 Maintenance of Compressor : Blowering and cleaning,dedusting, Lubrication of Cylinder, Blow down etc .Checking Voltage and Earthing and terminal tightness of components i.e MCB,Terminals,Fuse,etc.Repair/Replacing the faulty component like MCB,I/O Terminals,Fuse,Controller etc. Checking the Voltage Restoring the normal working condition. Maintenance work to be carried out as per direction of EIC. 25 Maintenance of Dryer: Blowering and cleaning,dedusting of Dryer, Lubrication of Cylinder, Blow down etc .Checking Voltage and Earthing and terminal tightness of Dryer components i.e MCB,Terminals,Fuse,etc.Repair/Replacing the faulty component like MCB,I/O Terminals,Fuse,etc. Checking the Voltage Restoring the normal working condition. Maintenance work to be carried out as per direction of EIC. 26 Preventive & Maintenance of Instrument Control Valves: Blowering and cleaning, dedusting/Covering and Lubrication of Control valve, check the Supply/signal 4- 20MA .Checking the operation of the control valve and also operation from the Control Room. Maintenance work to be carried out as per direction of EIC. 27 Preventive & Maintenance of Flowmeter with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA .Checking the operation and also operation from the Control Room.Maintenance work to be carried out as per direction of EIC. 28 Preventive & Maintenance of level sensor/Switch with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA.Checking the operation and also operation from the Control Room. Maintenance work to be carried out as per direction of EIC. 29 Preventive & Maintenance of Solenoid Valve/Pneumatic Cylinder: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA .Checking the operation and also operation from the Control Room. Maintenance work to be carried out as per direction of EIC. 30 Preventive & Maintenance of Pressure Gauge/Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA .Checking the operation and also operation from the Control Room. Maintenance work to be carried out as per direction of EIC. 31 Preventive & Maintenance of Digital Panel meter/Timer/PID Controller/LIP: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA .Checking the operation and also operation from the Control Room. Maintenance work to be carried out as per direction of EIC. 32 Preventive & Maintenance of Ash Handling System: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA .Checking the operation and also operation from the Control Room.Maintenance work to be carried out as per direction of EIC. 33 Preventive & Maintenance of TSP Bagging System: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA/Calibration with test weight .Checking the operation. Maintenance work to be carried out as per direction of EIC. 34 Preventive & Maintenance of Ball Mill Weigh Machine: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA/Calibration with test weight .Checking the operation. Maintenance work to be carried out as per direction of EIC. 35 Preventive & Maintenance of Boiler Belt Weigher: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA/Calibration with test weight .Checking the operation. Maintenance work to be carried out as per direction of EIC 36 Preventive & Maintenance of Rechloride Bagging System: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20MA/Calibration with test weight .Checking the operation. Maintenance work to be carried out as per direction of EIC. 37 Fixing/Replacement/Testing and Calibration/Dedusting/Cleaning/Covering/Wiring of Belt weigher/Weighing Machine/Load cell with Standard Weight/Standard Chain. Maintenance work to be carried out as per direction of EIC . 38 Fixing/Replacement/Testing/Dedusting/Cleaning/Covering/Wiring of Fire Alarm System/CCTV Camera. Maintenance work to be carried out as per direction of EIC .
|