Tender For Spr 2000160017 40 Smp-2 M Conarc Upper Shell No 4 Revampin 1 2000160017 40 10 10 CONARC UPPER SHELL REVAMPING JOB 1 NO Email : meena.bhagat@amns.in Contact : Name : Meena Bhagat Item Details : SMP-2 M CONARC UPPER SHELL NO 4 REVAMPING JOB Annexure – 1 SOW-SMP-2 M UPPER SHELL NO 4 MAJOR REFURBISHMENT JOB,, ,,,, 1. Scope of Work- Vendor: -,, A. Technical:,, ,,,, 1,,Chemical cleaning of Spoke frame assembly (With panels),, 2,,All wall panels to be removed Expect door tunnel - QTY-45 nos panels to be removed ,, 3,,Slag door shaft ,Slagdoor assembly with Cylinder to be removed,, 4,,Wall panels cooling headers need to repaired / replaced.,, 5,,Pipe line re routing modification wherever required,, 6,,Upper shell Bottom 40 mm thk collar plate /Top header collar plate repairing / changing .,, 7,,Roof loosening cylinder opening collar plate portion permanent blind plate fixing at 4 positions.,, 8,,Panel no 18/19/20 return header modification to be done ( Extra header beside cylinder for easy approach),, 9,,Canopy plate fabrication and fixing (Slag door side and EBT side),, 10,,All open/Valve fitted unwanted tapping to be closed by plate welding ,, 11,,Trunnion Inspection & DP test to be carried out by third party.,, 12,,EBT platform and its railing repairing to be done.,, 13,,Shot blasting and Painting work of upper shell,, 14,,All RTD to be taken in Line.,, 15,,All valves handles faced to be out side and open in bottom direction ,, 16,,Slag door shaft /Cylinder assembly and slag door panel fixing,, 17,,Header Locking to be checked and repaired if any.,, 18,,Each header joints DP test to be done by Contractor's workmen & verified by AM/NS's Engineers.,, 19,,All panels thickness checking ,, 20,,Panel no 7/8/18/19 & 21 need to be changed on thickness basis.,, 21,,Remaining Panels fixing and cooling hoses connections after panels fixing,, 22,,Hydro test and header/ panels flushing work,, 23,,Flushing to be done in both direction to ensure valve openings.,, 24,,Type -8 (copper panel) And cojet panel to be fix as per decided Furnace position.,, 25,,Pressure test to be done after at 10 bar after complete assembly .,, 26,,Top side all wall panels - extra lock need to be provide.,, 27,,Manpower details: -Supervisor-1, Argon/Arc Welder-1, Pipe Fabricator-1, Gas-cutter-1, Grinder-1, Fitter-1, Rigger-1, Technician-1 & Helper-1 working in 10/12/16 hours shift in Day/Night as per suite to site. ,, 28,,Supervision of job execution at Plant site is in Contractor’s Scope. ,, 29,,Availability of Welding rod as per job requirement is in Contractor's scope.,, 30,,Availability of certified Welding Machine with short cable & its consumables is in Contractor's Scope. In case of argon welding, complete set will be supplied by contractor.,, 31,,Availability of certified Cutting set and its consumables is in Page 2 of 3 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000128224 Date 31.01.2025 Submission Date 09.02.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Latha ArunKumar Contact Email latha.arunkumar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Contractor's Scope.,, 32,,Availability of certified Grinding machine (AG-7, AG-5 & AG-4)- 3 set, Buffing machine-1 is in Contractor's Scope.,, 33,,Availability of Pipe Bending machine with dies is in Contractor’s Scope.,, 34,,Availability of Buffing machine is in Contractor's scope.,, 35,,Availability of Tools & Tackles, lifting belts and Chain Pulley Blocks is in Contractor’s Scope.,, 36,,Availability of DPT items for Header joints is in Contractor’s Scope.,, 37,,Mobilization and demobilization of all Tool set is in Contractor's scope.,, 38,,Job completion estimation duration is 3 months,, ,,,, B. Safety:,, ,,,, 1,,Contractor should ensure valid Scrum Pass issued on account of SMP-2 work order only to all deployed Manpower at SMP-2 site if applicable.,, 2,,Contractor should ensure timely completion of SMP-2 SMS Mech Induction training of all newly joined Manpower of specific area if applicable.,, 3,,Contractor should ensure timely completion of Job-specific Safety Training as per MSA to their personnels.,, 4,,Contractor should ensure timely completion of Work at Height (W@H) Training, particularly for activities involving elevated work areas,, 5,,Contractor should ensure availability of required Safety PPEs (Boiler suit, Safety Jackets, Safety shoes, FRP Helmet, Goggles, Ear plug, Nose mask, Hand gloves, Safety harnesses and safety nets for work at height) to their Manpower on regular basis.,, 6,,Supervisor & skilled manpower should be aware of working condition (safe & un-safe) , risks & hazards as well as behavioural safety associated with assigned jobs.,, 7,,All associates should participate in Tool box talk.,, 8,,Contractor should ensure completion of pre & post maintenance activities.,, 9,,Associates should ensure proper housekeeping at designated work place after job completion.,, 10,,Associates should ensure proper discard/storage of damaged material at designated location.,, 11,,Normal working hours duty to be strictly followed and more than 16 hours continuous duty is not allowed as well as weekly off to be avail as per schedule only.,, 12,,Transportation via Bus service/Utility vehicle of owned associates shall be in Contractor’s Scope.,, 13,,No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises.,, 14,,Should strictly follow all Safety norms of AM/NS India.,, ,,,, C. Statutory:,, ,,,, 1,,Contractor should ensure deployment of Manpower as per job requirement & AM/NS Competency Matrix latest revision.,, 2,,Employee Workman Compensation Policy: The vendor must maintain an Employee Workman Compensation Policy/Group Insurance policy to cover workplace injuries.,, 3,,Tools and Equipment: All tools and tackles used must have valid certification from a competent authority.,, 4,,Contractor should submit Attendance report/Jobs certification sheet & Job completion feedback form (designated format of SMP-2 SMS M Department) duly signed by Execution engineer & Section in-charge with Invoice for Service Entry before 10th of every month and upload the same to Invoice portal.,, ,,,, D. Penalty:,, Specific Penalty for non-performance by vendor and must be cardinally measured-,, 1,,Penalty will be imposed is case of non-conformity of Work.,, Page 3 of 3 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000128224 Date 31.01.2025 Submission Date 09.02.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Latha ArunKumar Contact Email latha.arunkumar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 2,,Penalty will be imposed in case of noncompliance to HSE norms.,, 3,,Penalty will be applicable due to poor workmanship, Safety violation, damage to AM/NS property from contractor side.,, 4,,As per Management Directive, transport / movement of associates to & fro for Plant should by mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed. ,, ,,,, 2. Scope of Work- AM/NS India: -,, 1,,Job certification for executed jobs (as per actual) is in AM/NS’s scope.,, 2. Chemical cleaning to be done by third party is in AM/NS's scope.,, 3. Shot blasting and Painting work of upper shell to be done by third party is in AM/NS's scope.,, 4. Upper shell trunnions DP test & Inspection to be done by third party is in AM/NS's scope.,, 5,,Provision of all Spares for refurbishment job execution is in AM/NS’s scope.,, 6,,Provision of all Structural materials-angle, channel, beam, plates, pipes & pipe fittings, etc. is in AM/NS’s scope.,, 7,,Provision of Paints, Hardener & Thinner is in AM/NS's scope. 8,,Provision of scaffolding for maintenance job execution is in AM/NS’s scope.,, 9,,Provision of air/gas line for maintenance job execution is in AM/NS’s scope.,, 10,,Co-ordination for shutdown if applicable and work permit is in AM/NS’s scope.,, 11,,Provision of Dumper, Hydra, Trailer, Bolero for material movement, loading & unloading is in AM/NS's scope.,, 12,,Drinking water, Power supply, lighting facilities, Working Platform, etc. for workmen at Plant site is in AM/NS’s scope.,
|