Flateral Switches, Conditional Transition Diameter For A Conventional Pressurized Manual Or Transmitter Water Pipeline Up To 4 Mpa: 400 Mm (Demolition Of Reflection In The Entrance Pipes), Flateral Switching, Conditional Transition Diameter For A Conventional Pressurized Manual Or Transmitter Water Pipeline To 4 Mpa: 400 Mm (Installation Of The Valve In The Entrance Pipes), Hand-Controlled Butterfly Valve D = 400 (10Atm) (Turkey), Flange Fittings For A Conventional Pressurized Hand Or Transmitter Water Pipeline, Up To 4 Mpa, Conditional Transition Diameter: 300 Mm (Dismantling, Flange Fittings For A Conventional Pressurized Hand Or Transmitted Water Pipeline By 4 Mpa, Conditional Transition Diameter: 300 Mm (Installation Of Valve), Butterfly Drawer With Threaded Box Özkan D=300Mm 10Bar (Turkey), Excavation Of The Soil By Throwing It Aside With Reverse Bucket Or Dragline Type Excavators With A Bucket Capacity Of 0.65 (0.5-1) M3, Soil Group: 2, Hand By Group, Group, Group: 2 (Pipe Opening) In Sloped Trenches, Which Is Up To 2 M, Withdrawal Of Steel Water Pipelines, Hydraulic Testing, Diameter Of The Pipes: 300 Mm (Unusable D = 325X6 Mm Demolification Of Steel Multiplication Pipe), Transportation Of Concrete, Reinforced Concrete Products, Wall And Partition Materials (Bricks, Blocks, Stones, Tiles, Panels), Round Forest Materials And Sawn Materials By Flatbed Vehicles With A Carrying Capacity Of 15 Tons (Code 400004). Transportation Distance - 5 Km. 1St Class Cargo, Manual Planning Of The Bottom And Slopes Of The Excavated Places Of Channels, Correction Of The Basis Under Pipelines: From Sand, Laying Of Pipelines From Polyethylene Pipes, Diameter: 315 Mm (Pn10), Manually Filling The Trenches, Pits And Holes, Group Of Ground: 2, Filling Of Pits And Trenches By Changing The Ground To The Ground Up To 5 M, The Power Of Bulldozers: 96 (130) Kw (A.G.), Group 2 Ground
|