Engineering Services – Renovation Of Platen-Gymnasium Ansbach, Specialist Planning Of Technical Equipment. The Order Includes The Specialist Planning Of Technical Equipment In Accordance With Part 4 Section 2 Hoai Ag 1-8, Service Phases (Lph) 1-9, For The Renovation Measure Fire Protection + Accessibility + Building Blocks For The Renovation Of Platen-Gymnasium Ansbach. It Is A Step-By-Step Commissioning Of Services From Lph 1 -9 Provided: ----- - System Group 1 Wastewater, Water And Gas Systems, - System Group 2 Heat Supply Systems, - System Group 3 Ventilation Systems, - System Group 4 Power Systems, - System Group 5 Telecommunications And Information Technology Systems, - System Group 6 Elevator Systems, - System Group 7 Use-Specific Systems, - System Group 8 Building Automation ----- The Buildings Of The Platengymnasium Are Mainly Reconstructed From The End Of The 1950S Of The 20Th Century (B, C, D Building). As A Pre-War Building, Parts Of The A Building Have Been Preserved. Additional Buildings Were Added From The Late 1990S To The 2000S. This Includes The Construction Of A New Auditorium, As Well As The Construction Of A Cafeteria And Group Rooms. The Platengymnasium Is Part Of The Old Town Monument Ensemble. ----- According To Current Regulations, There Are Fire Protection Deficiencies In The Platengymnasium. Temporary Measures To Avert Danger Are Currently Being Prepared And Implemented. This Includes The Installation Of A Fire Alarm System And The Construction Of Scaffolding Stairs To Ensure Escape And Rescue Routes. The Analysis Of The Building Also Shows A Number Of Other Deficient Construction Conditions. These Include, For Example, Lack Of Or Non-Existent Accessibility, Missing Or Decommissioned Ventilation Systems, Etc. ----- Project Goals: ----- A. Project Goals Water, Wastewater, Heating, Ventilation ----- - Building Physics (Thermal Building Physics, Room Acoustics) Upgrading Of Building B - Development And Implementation Of A Ventilation Concept For The Specialist Classroom Areas - Development And Implementation Of A Site Energy Concept For The School Complex With Renewal Of The Heat Generation Systems (Specialist Planner) - Renovation Of Individual Sanitary Areas ----- B. Electrical Engineering Project Objectives: ----- - Fire Protection Upgrade Based On The Working Basis Of The Existing Fire Protection Analysis/The Existing Fire Protection Concept Including The Fire Extinguishing Water Supply. A Specific Escape Route System (Corridor School Or Cluster) Is Not Mandatory And Is Determined In The Planning Process. The Creator Of The Fire Protection Analysis Accompanies The Property And Specialist Planners As A Fire Protection Planner. - Setting Up The Structural Components Of An Ngrs (Emergency And Hazard Response System) Such As A Control System, Locking System, Intercom System, Alarm System ----- C. Project Goals Sustainability, Economic Efficiency In Construction And Maintenance: ----- The Aim Is To Achieve One In Construction And Operation Economical And Safe Building. The Aim Is To Create A Building Concept That Is Sustainable And As Simple As Possible. In This Sense, The Following Points Should Be Taken Into Account In Particular: - Longevity Of The Components And A
Contact Information
Contact No.
+49 98151335
Email
vergabestelle@ansbach.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91229733
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.