Consultative Engineering And Construction Services - Exercise Of Nsn And Fidic Engineer On Engineering Contracts For Water Supply Plan For Site: Reconstruction Of Water Supply Pumping Stations In Dobrich Region. The Scope Of Work Includes: Engineer Within The Meaning Of Clause 3 Of Contract Terms For Technological Equipment And Design – Construction For Electrical And Mechanical Installation Works And For Construction And Engineering Facilities Designed By The Contractor. General Conditions - International Federation Of Consulting Engineers (Fidic) And/Or Clause 3 Of Contract For Construction For Building And Engineering Facilities Designed By The Client. General Conditions - International Federation Of Consulting Engineers (Fidic) (Fidic) - Which Is Applicable, According To The Type Of Contract/S, Object Of The Service, As Well As The Relevant Specific Conditions; Technical Design Control For Design And Construction (Engineering) Contract(S), Incl. Preparation Of Report/S For Assessing The Compliance Of Investment Projects For The Sites Described In The Terms Of Reference; Conformity Assessment By Part Constructive Within The Meaning Of Art. 142, Para. 10 Of The Zut, Where Applicable; Construction Supervision Within The Meaning Of Art. 168 Of The Territorial Planning Act /Zut/; Safety And Health Coordinator For The Investment Design Stage And For The Construction Stage; For The Following Sites: Modernization Of Primortsi Substation, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(3 Working And 2 Spare). Modernization Of Minkovo Substation, Including Reconstruction And Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(3 Working And 1 Spare). Modernization Of Obrochishte Railway Station, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(3 Working And 2 Spare). Modernization Of Substation Balchik 1, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Etc.)(2 Working And 1 Spare). Modernization Of Substation Balchik 2, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(1 Working And 1 Spare). Modernization Of Substation Batova 2, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(3 Working And 2 Spare). Modernization Of Odrintsi Station, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(3 Working And 1 Spare). Modernization Of Almalii Station, Including Replacement And Modernization Of Pumping Units, Pipe Systems, Electrical Equipment, Decontamination And Disinfection System, Etc.)(1 Working And 1 Spare). The Specific Activities, As Well As The Requirements For Their Implementation, Are Detailed In The Technical Specifications, Which Are An Integral Part Of The Public Procurement Documentation.
|