Environmental Monitoring For Construction – Hwsb Blumenthal Km 12.5-13.4 Ecological Construction Support And Monitoring. Ecological Construction Support And Monitoring. Services In The Construction Phase: Familiarization With Existing Documents, Preparatory Services For Construction: Documentation Of The Actual Condition Of The Construction Areas Before Construction Begins (Photo Documentation, Description Of The Current State Of Use), Which Are Not Used For The Construction Work Or Are Only Used For A Limited Time Or In Some Other Form May Be Impaired, Information On Necessary Avoidance And Protective Measures. Coordination With The Client And The Responsible Authorities, Construction Supervision: Control Of The Off-Limits Areas During The Construction Process, Participation In The Implementation Of Avoidance And Protective Measures (E.G. Amphibious Fences, Off-Limits Areas, Tree Protection), Participation In The Planning Of The Construction Process, Participation In The Clarification Of Cases Of Damage, That Have Caused Environmental Damage, If Necessary, Short-Term Creation And Implementation Support Of Protective And Avoidance Measures, Creation Of Protocols (Inspection And Meeting Minutes) And Independent Transmission To The Responsible Authorities, Documenting The Environmentally Relevant Construction Process (Notes, Photos), Advising The Local Construction Supervisory Authority And The Construction Company On Nature Conservation And Environmental Law Issues, Advising On Determining Methods Of Execution That Avoid Or Reduce Interventions, Irregular Inspection Of The Construction Site And All Sensitive Areas (At Least 2 Days/Month) Participation In Coordination And Construction Consultations On Site (1 Day/Month), Documentation/Final Report, Services After The Construction Phase (Monitoring): Implementation Of Monitoring Until The Intended Development Goal Is Documented In Accordance With The Provisions Of The Intervention Permit For A Coherence Assurance Measure (Re-Establishment Of Lrt 6510 On The Dike Body) And The Planting. The Monitoring Period Is 3 Years For The Coherence Assurance Measure And 5 Years For The Planting Of Woody Plants. . The Contractors Local Presence Must Be Ensured At Regular Intervals During The Construction Period, At Least Twice A Month. Personnel Continuity In Terms Of On-Site Presence Must Be Ensured Throughout The Entire Construction Period. . After The Construction Period, Monitoring Must Be Carried Out To Document Whether The Intended Development Goal Of The Coherence Assurance Measure And The Compensation Measures Have Been Achieved. The Monitoring Period Is Up To 5 Years, With At Least 3 Inspections Per Year Being Ensured.
Contact Information
Address
Otto-von-Guericke-Straße 5
Contact No.
+49 391 5810
Email
vergabestelle.nord@lhw.mlu.sachsen-anhalt.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89987780
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.