Environmental Monitoring For Construction – Hwsb Elbdeich Right Km 35.5 - 38.4 - Ecological Construction Monitoring. As Part Of The Implementation Of The State Of Saxony-Anhalts Flood Protection Concept, The Planned Dike System Will Be Expanded In Accordance With The Current Regulations And Guidelines. A Ballast Berm Will Be Created On The Landside Side Of The Existing Dike Over The Entire Planning Section Using Prefill. In Accordance With The State Of The Art, A Dike Defense Path (Dvw) Will Be Created On This For Dike Defense In The Event Of Flooding And For Dike Maintenance. In Addition, A Dike Control Path (Dkw) Will Be Built On The Top Of The Existing Dike To Simplify Dike Control. The Dvw And The Dkw Will Be Connected To The Existing Path System. Ecological Construction Supervision Is Required For These Construction Works. Services In The Construction Phase - Familiarization With Existing Documents - Preparatory Construction Services • Documentation Of The Actual Condition Of The Construction Off-Limits Areas Before Construction Begins (Photo Documentation, Description Of The Current State Of Use), Which Are Not Used For The Construction Work Or Are Only Used For A Limited Time Or Are Not Affected In Any Other Way May. • Information On Necessary Avoidance And Protective Measures In Accordance With The Landscape Conservation Plan And The Approval Documents. Coordination With The Client And The Responsible Authorities. Construction Supervision • Control Of Construction Off-Limits Areas During The Construction Process. • Participation In The Implementation Of Prevention And Protective Measures (E.G. Amphibian Fences, Off-Limits Areas, Tree Protection) • Continuous Coordination With The Responsible Authorities • Participation In The Planning Of The Construction Process • Participation In The Clarification Of Cases Of Damage That Have Caused Environmental Damage. • If Necessary, Short-Term Creation And Implementation Support Of Protective And Avoidance Measures. • Creation Of Minutes (Inspection And Meeting Minutes) And Independent Transmission To The Responsible Authorities. • Documenting The Environmentally Relevant Construction Process (Notes, Photos). • Advising Local Construction Supervision And The Construction Company On Nature Conservation And Environmental Law Issues. • Advice On Determining Types Of Implementation That Avoid Or Reduce Interventions. • Irregular Inspection Of The Construction Site And All Sensitive Areas (At Least 2 Days/Month). • Participation In Coordination And Construction Consultations On Site (1 Day/Month). - Documentation/Final Report Services After The Construction Phase Goal: Establishment Of The Lrt 6510 - Lean Lowland Hay Meadow - On An Area Of 63,675 M² Of The Repaired Dike And The Dike Protection Strip For This: • Control Of The Completion And Development Maintenance • Advice To The Person Responsible For The Completion And Development Maintenance ( Garden) Construction Company (E.G. Specification Of Mowing Times, Handling, Etc.). • Coordination With The Lower Nature Conservation Authority (If Necessary) • Documentation Of The Development Goals Achieved (1 Short Report/Year) The Approach For Offer Calculation Is A Control Activity For A Period Of 4 Years
Contact Information
Address
Otto-von-Guericke-Straße 5
Contact No.
+49 391 5810
Email
vergabestelle.nord@lhw.mlu.sachsen-anhalt.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89926541
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.