Tenders Are Invited For Environmental Impact Assessment (Eia) Services For Construction – Environmental Impa ... in Netherlands The
Tender Notice
TenderID
89473578
Tender Brief
Tenders Are Invited For Environmental Impact Assessment (Eia) Services For Construction – Environmental Impact Assessment Study Finland For Company Builder Volaghy
Environmental Impact Assessment (Eia) Services For Construction – Environmental Impact Assessment Study Finland For Company Builder Volaghy. The Scope Is Related To Managing The Complete Eia (Environmental Impact Assessment) Process On Behalf Of The Company Builder Volaghy. Volaghy Will Establish Several Production Facilities For The Production Of Synthetic Aviation Fuel (Esaf). The Project Location Is Situated Somewhere In Finland. On High-Level, The First Volaghy Site Will Have The Following Characteristics: •Intake O 200 – 250 Kton/Y Captured Co2 From Flue Gases O 220 – 250 Mw Of Electrical Energy O 300 – 400 Kton/Y Of Water •Intermediates O130 – 150 Kton/Y Methanol (Alternative 1) • Products O 40 – 60 Kton/Y Kerosene (Esaf) O 1 – 4 Kton/Y Naphtha (Enaphtha) O 1 – 2 Kton/Y Diesel • Other Emissions O Flue Gas From Flare And Fired Heaters O Treated Wastewater •Storage Facilities (Capacity: Tbd) For: O Co2 O Raw Meoh O Meoh, Grade Aa O Esaf O Naphtha O Diesel •Land O 10 – 20 Ha With T/Kem Zoning Approved In Finland Deliverables (For One Site) 1. Eia Planning And Permitting Schedule (First Step) O A Detailed Time Plan For The Eia Process From Start To Approval, Including An Assessment Of Key Risks And Necessary Process Steps. O A Time Plan Incorporating All The Other Necessary Permits And Their Timing From Application To Approval 2.Eia Programme And Report (Second Step) O Alternatives ▪ 1. The Plant Is Not Built ▪ 2. Production Capacity Of 50 Kton/Y ▪ 3. Production Capacity Of 100 Kton/Y O The Work Shall Include The Compiling Of The Eia Programme And The Eia Report For The Project And Its Alternatives As Regulated In The Finnish Act On The Environmental Impact Assessment Procedure 252/2017 And The Decree Of The Government On The Environmental Impact Assessment Procedure 277/2017. O Other ▪ The Eia Shall Include The Necessary Piping Needed To Integrate Process Streams Between The Co2 Source And Our Site. This Distance Is Foreseen To Be 0 – 3 Km. ▪The Eia Shall Include The Integration Work From Our Plant To The Existing District Heating Network. The Point Of Interface Shall Be 0 – 3 Km From Our Site. Options The Following Options Shall Be Provided Within The Tender: 1.The Complete Process And Deliverables (1. And 2. In Deliverables Above) For A Second Site With The Same Characteristics 2.A Site-Specific Natura Assessment (One Site) 3.Air Quality Modelling (One Site) 4.Noise Modelling (One Site) 5.Questionnaire To Key Stakeholders (Drafting, Analyzing And Summarizing The Survey) (One Site) 6.Interviews With Key Stakeholders (One Site)
Contact Information
Contact No.
031681412446
Email
christof.breda@innoenergy.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89473578
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.