Quotation Are Invited For Supply Of The Co2 Lock Off Key With Relay Switch And Door Lock Cylinder Assembly O ... in United Arab Emirates
Tender Notice
TenderID
89333553
Tender Brief
Quotation Are Invited For Supply Of The Co2 Lock Off Key With Relay Switch And Door Lock Cylinder Assembly Of Rigid Stainless-Steel Material For The Gas Turb Ineco2 Protected Doors
Quotation Are Invited For Supply Of The Co2 Lock Off Key With Relay Switch And Door Lock Cylinder Assembly Of Rigid Stainless-Steel Material For The Gas Turb Ineco2 Protected Doors M Station Co2 System - Servic 1032404938 1 Item-00001 1.Supply Of The Co2 Lock Off Key With Relay Switch And Door Lock Cylinder Assembly Of Rigid Stainless-Steel Material For The Gas Turb Ineco2 Protected Doors As Per The Applicable Standards.2.#Installation Of Co2 Lock Off Key Assembly In Status Indicator Anddoor Lock Assembly In Respective Co2 Protected Door3.#Functionality Testing Of Co2 Lock Off System In The Extinguishingcontrol Panel Of The R Espective Area For Verification Properfunctionality Of Lock Off Mode And Safe To Enter Mode In The Statusindicator4.#The Contractor Is Responsible To Ensure Smooth And Proper Operationof The Co2 Protected Doors With The New Cylinders Without Any Mechanicaljam.5.#T He Lock Off Key System Shall Be Selected From The Reputedmanufacturer And Suitable To The Environment Condition. 13 Ea Each Lock Shouldbe Provided Along With 5 Set Of Stainless-Steel Keys.6.#Kks, Name Plates Where Applicable Shall Be Provided In Non-Corrosivestainless-S Teel Plates As Per The Dewa Requirement (If Applicable).7.#The Bidder Shall Provide Tentative Date For Material Delivery,Commencemen T And Completion Of The Above Identified Activities.8.#The Complete Handling Of The Materials Including Transport From Shopto Site, Loading And Unloading, Storing At Site Till The Installationshall Be Done By The Contractor At His Cost And Responsibility.9.#The Sc Affolding (Wherever Required) Shall Be Provided And Installedby Contractor. It Is The Contractor#S Sole Responsibility To Ensure Tha Tno Disturbance, Interference, Or Interruption To Be Caused On Normalplant Operation. Any Damage To The Equipment During The Executi On Workshall Be Restored Immediately By The Contractor With The Same Material.10.#Any Replaced Parts/Scrap, Which Is Not Required By Dewa Shall Beremoved From Site. The Disposal Is The Contractor Responsibility. Theother Materials, Scraps Of The Replaced Equipment , Which Dewa Requiresare To Be Transferred To The Assigned Station Location By Thecontractor. Any Place, Where Old Equipment Had Bee N Removed, Must Becleaned For Good Housekeeping Special Notes / Instructions: M Station Co2 System - Services Job For The Co2 Lock Off System. For Technical Clarification, Ramesh Kumar Ramesh.R@Dewa.Ae Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332403066)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 89333553
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.