Construction Project Management Services – 24D Project Management Construction And Vgv. The Expansion Of The B 15 - Nordgaustraße And Its Continuation Over The Regen To The Lappersdorf Roundabout As Well As The Connection To The A 93 And The B 16 Are Central Infrastructure Projects In The Regensburg Area. The City Of Regensburg Is Planning To Expand Nordgaustraße (B 15) North Of The Intersection With Brennesstraße/Isarstraße To Four Lanes. After The Intersection With Amberger Straße, The Street Passes Over A New Bridge (Sallerner Regenbrücke) And Is Connected To The Regensburg-Nord Motorway Junction Of The A 93 And To The B 16 (Lappersdorfer Kreisel). The Existing Lappersdorfer And Regensburger Straße (Rs 18 Or R18) Will Be Expanded And Adapted Accordingly. Another Focus Of The Project Is The Reconstruction Of The Lappersdorf Roundabout In Order To Optimize The Connection To The A 93 And The B 16. Large Parts Of The Planning Services Described Must Be Carried Out Using The Bim Methodology. Sallerner Regenbrücke The Regensburg State Building Authority Is Planning To Build The Sallerner Regenbrücke As Part Of The Expansion Of Nordgaustraße (B15) By The City Of Regensburg. The Expansion Includes: - The New Construction Of The Sallern Rain Bridge With A Length Of Approx. 280 M - The Construction Of A New Junction On The Extended Nordgaustraße With The New Connecting Bridge B 15/B 16, - The Adaptation Of The Intersections With Lappersdorfer Straße And Karether Hauptstraße , The Settlement Street And The Mountain Street As Well As - The Establishment Of A Footpath And Cycle Path On The South Side Of The Extended Nordgaustraße And The Adaptation Or Expansion Of The Existing Pedestrian And Cycle Path Network On Lappersdorfer And Regensburger Straße. Reconstruction Of The Lappersdorfer Roundabout (Distribution Ring At The As Regensburg Nord Of The A93) The Distribution Ring At The Junction (As) Regensburg Nord Of The A93 Federal Motorway (Lappersdorfer Roundabout) Is Located North Of The Heavily Used Pfaffenstein Tunnel Of The A 93. The Connection Of The A 93 With The B 16, Access To Lappersdorf And The R 18 District Road Is Currently Via The Lappersdorf Roundabout. The Renovation Measures Include: - The New Construction Of A Connecting Bridge B 15/B 16 To The Connection To The Existing Federal Highway B16 Shortly Before The Repository Of The Rain Bridge, - The New Construction Of Several Direct Ramps, Including From The A 93 - B 16 To The Connecting Bridges B 15/ B 16 , Including Necessary Structures For The Unplaned Crossing Of The Roundabout. - The Construction Of Several Exit Ramps From The Direct Ramp A 93 - B 16 - The Adaptation Of Several Driveways Or Sections, In Some Cases With New Construction Of Junctions With Traffic Lights (Lsa). - The Conversion Of The Inner-City Connection From Lappersdorf To A Roundabout Including The Adaptation Of The Connecting Branches - The New Construction Of A Public P+M Parking Lot Including A Connecting Road, - The Dismantling Of Traffic Areas And Structures That Are No Longer Required And - The Establishment Of A New Drainage System With Drainage Troughs, Piping, Treatment And Derivation Of The Existing Pref
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88689486
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.