Health And Safety Services – Rostocker Oval - Warnowbücke - Sigeko. As Part Of The Inner-City Developments Around The Lower Warnow, The Hanseatic And University City Of Rostock Intends To Build A New Pedestrian And Cycle Path Bridge Over The Warnow With The Subsequent Traffic Facilities In The Area Of The Bridge. The Bridge Is 550M Long And 6M Wide Between The Railings. The Bridge Is Supported By 17 Steel Columns Founded On Steel Piles. The Traffic System Connected To The Bridge In The Project Connects The Bridge To The Inner-City Network Of Roads. To Cross The Waterway, The Bridge Will Be Equipped With An Approx. 20M Long Bascule Section (Bascule Bridge). For The Measure Described, This Tender Is Intended To Award The Service For Safety And Health Coordination In Accordance With The Construction Site Ordinance (Baustellv). The Purpose Of This Award Is To Ensure That Safety And Health Issues Are Fully Incorporated Into An-Baus Execution Documents. For This Purpose, The Commissioned Planning Consortium Must Be Given Specifications In The Implementation Planning And The Commissioned Construction Companies In The Construction Process Planning Or Construction Preparation And Their Training Must Be Checked. Safety And Health Protection Coordination Services Are Commissioned During Planning, Construction Preparation And Construction Execution. In The Construction Phase, The Focus Of The Activity Is On Accompanying And Monitoring Safety On The Local Construction Sites And On Accompanying And Monitoring Construction Site Logistics For The Entire Construction Project. The Ordinance On Safety And Health Protection On Construction Sites (Construction Site Ordinance - Baustellv) Leaves It Up To The Building Owner To Transfer His Tasks From Sections 2 And 3 To A Responsible Third Party. The Resulting Tasks Of The Client Are Part Of The Engineering Service To Be Agreed. The Number Of Contracted Construction Companies And Their Subcontractors As Well As The Number Of Personnel Deployed On The Construction Site Must Be Assumed In Advance From The Values Of Professional Experience. We Are Currently Assuming Around 20 Companies. The Basis For The Engineering Contract To Be Concluded Is The Occupational Safety And Health Act, The Construction Site Regulations For Occupational Safety And Health Protection, And The Relevant Rules For Occupational Safety On Construction Sites (Rab). The Rab Can Be Viewed And Downloaded At Http://Www.Baua.De. Construction-Related Support And Monitoring Of Occupational Safety And Occupational Safety Measures Are Part Of This Engineering Contract.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88686304
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.