Quotation are invited for M Station HRSG 11, 12 & 21 Diverter Damper Inspection by OEM M/S NEM Technical Field Advisor (TFA). TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORKM STATION, JEBEL ALI POWER STATIONTITLE: M STATION HRSG 11, 12 & 21 DIVERTER DAMPER INSPECTION BY OEM M/SNEM TECHNICAL FIELD ADVISOR (TFA).A.#QUANTITY:·#QUANTITY: 03 UNITSB.#DURATION & SCHEDULE:·#02 DAYS FOR E ACH DIVERTER DAMPER·#WORK TO BE DONE DURING ANNUAL OUTAGE STARTING FROM JAN#2025 TOMAY#2025.O#HRSG 11 - TO BE CARRIED OUT DURING HRS G 11 OUTAGE, TENTATIVE SCHEDULEIS STARTING FROM 07.04.2025.O# HRSG 12 - TO BE CARRIED OUT DURING BLOCK 10 OUTAGE, TENTATIVESCHEDULE IS STARTING FROM 07.04.2025.O#HRSG 21 - TO BE CARRIED OUT DURING HRSG 21 OUTAGE, TENTATIVE SCHEDULEIS STARTING FROM 15.01.2025.·#THE ABOVE SCHEDULE IS TENTATIVE AND IF ANY CHANGES, IT WILL BECOMMUNICATED.C.#PRE-BID SITE INSPECTION:·#DD OEM TFA SHALL BE FULLY FAMIL IAR WITH THE WORK SCOPE, PLANT ACCESS,FACILITIES, COMPLEXITIES, ETC., BEFORE SUBMITTING THE BID. DEWA WILL NOTACCEPT ANY CLAIM FOR E XTRAS BEYOND THE ORDER AMOUNT DURING OR AFTER THEEXECUTION OF WORK ORDERED. A SITE VISIT CAN BE ARRANGED IF REQUIRED.CONTACT DETAILS FOR SITE VISIT.1.#ASHIL PRABHAKAR0585839585ASHIL.PRABHAKAR@DEWA. GOV.AE2.#SHABBIR AHMED0586407243SHABBIR.ENULHAQUE@DEWA.G OV.AED.#SCO PE OF WORK:·#MOBILIZE WITHIN 02 DAYS OF ADVANCE NOTICE.·#CHECK DIVERTER DAMPER OPERATIONAL TEST AT SITE ALONG WITH DEWA PRIORTO STAR T OF INSPECTION AND CHECK THE FOLLOWING.O#OPERATING TIME FOR NORMAL OPENING, NORMAL CLOSING, AND EMERGENCYCLOSING.O#SEAL AIR PRESSUR E CONDITION.O#HPU CONDITION.O#ANY ABNORMALITIES.·#AFTER TEST AND OBTAIN PTW FOR INSPECTION (DEWA WILL ARRANGE)·#CONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKINGENVIRONMENT.·#ENSURE AREA IS CORRECTLY SECURED AND SAFE TO WORK ON IN ALL RESPECTS.·#IF T HE WORKING ENVIRONMENT IS SAFE, THEN PROCEED WITH THE FOLLOWINGSTEPS.·#CARRY OUT DIVERTER DAMPER VISUAL INSPECTION AS PER STANDARD O EMCHECKLIST.·#INSPECT ALL DIVERTER DAMPER COMPONENTS INCLUDING BUT NOT LIMITED TODAMPER BLADE, LAMELLA, HINGE MECHANISMS, CONNECTING ROD, TOGGLE ARM,SHAFT, COUPLING ETC. FOR ANY SIGNS OF WEAR, DAMAGE ETC.·#EXAMINE ALL THE WELDED JOINTS FOR CRACKS AND ANY DEFECTS. (DPT/MPIWILL BE DONE BY DEWA AS PER REQUIREMENT BY TFA)·#INSPECT DD SHAFT COUPLING USING BORESCOPE. (DEWA WILL ARRANGEBORESCOPE)·#PR OVIDE A DETAILED INSPECTION REPORT ON DIVERTER DAMPER HEALTHINCLUDING PHOTOS, INSPECTION CHECKLIST AND RECOMMENDATIONS IF ANY.·#RECO MMEND FUTURE MAJOR OVERHAULING REQUIREMENT IF NEEDED ANDSCHEDULE.·#ANY SPECIAL TOOLS IF REQUIRED SHALL BE ARRANGED BY OEM SPECIALIST .·#DEWA SCOPE:O#SCAFFOLDING.O#BORESCOPE.·#NOTE: SCOPE OF WORK MENTIONED HERE ONLY PROVIDES A BROAD OUTLINE OFTHE TASK. OEM NEM TFA M UST REVIEW THE ADEQUACY OF THE PROPOSED SCOPE OFWORK TO CARRY OUT REQUIRED TASKS AND ADD ANY ADDITIONAL WORK THAT ARENEEDED FOR SATI SFACTORY COMPLETION OF THIS PROJECT.E.#GENERAL TERMS & CONDITIONS:·#ALL DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATIONS SHAL L BEFOLLOWED AT THE WORK SITE DURING THE EXECUTION OF THE WORK. THECONTRACTOR SHOULD BE FAMILIAR WITH SAFETY REGULATIONS WHILE WORKI NG IN AHAZARDOUS AREA.·#THE WORK SHALL BE EXECUTED UNDER DEWA SUPERVISION AND AS PERQUALITY/SCHEDULE REQUIREMENT.·#ENTRY PERMITS SHO ULD BE APPLIED FOR WITH PASSPORT COPIES HAVING VALIDVISA. PERSONS WHOSE NAMES ARE NOT AVAILABLE IN THE LIST, WILL NOT BEALLOWED TO E NTER THE POWERHOUSE.·#ENTRY PERMITS FOR THE VEHICLE SHOULD BE APPLIED FOR WITH COPIES OFVEHICLE REGISTRATION.·#DEWA WILL ARRANGE NEC ESSARY PTW / LC & CONFINED SPACE ENTRY PERMITFROM OPERATION TO CARRY OUT THE SCOPE OF WORK UNDER THIS CONTRACT.·#THE CONTRACTOR UPON RECEIVING THE WORK PERMIT SHALL FIRST ENSURE ASAFE WORKING CONDITION.·#ALL THE PERSONS SHOULD WEAR ALL THE REQUIRED PPE WHILE AT WORK. Qty: 1 M Station HRSG 11, 12 & 21 Diverter Damper Inspection by OEM M/S NEM Technical Field Advisor (TFA). [ Scope of Work Attached ] Contact : Ashil.prabhakar@dewa.gov.ae / +971-432-26179 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332402722)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 87681771
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.