Civil Engineering Support Services – Maintenance Of Flood Embankments In Zz Sandomierz In 2025-2027 – Nw Sandomierz. The Subject Of The Order Is The Task Titled: Maintenance Of Flood Embankments In The Area Of Zz Sandomierz In The Years 2025 -2027 - Nw Sandomierz Total: Flood Embankments - 176.303 Km (175.201 Km According To Mphp), Embankment Locks For Supervision And Operation - 79 Pcs. . Length Of Outflows From Locks For Maintenance 5040 M (72 Pcs). The Length Of The Inflows To The Locks For Maintenance Is 720 M - Maintenance On A Section Of 10 M For Each Operated Lock. As Part Of Maintaining The Devices (Flood Protection Embankments), The Contractors Duties Include Performing The Following Works And Activities, In Particular: 1. Supervising And Patrolling The Flood Embankments And Embankment Devices Preventing Destruction, Grazing Of Cattle And Devastation Of These Devices In The Allocated Section. 2. Equipping Employees - Embankment Guards With Work Clothes And Footwear (Jacket, Trousers, Shirt, Shoes, Rubber Boots And Vests - With A Legible Inscription Reading Remake Guard For Use While Performing Their Duties, 3. Providing The Ordering Party With Direct Telephone Contact To The Employees Supervising Flood Embankments, 4. Equipping Employees With Appropriate Equipment, Including (Brushcutter, Shovel, Pickaxe, Forks, Axe, Pruner, Saw, Rake, Protective Clothing - Gloves, Face Shields, Safety Glasses, Cleaning Products, Work Clothes, Rubber Footwear, Waders) And The Necessary Consumables To Perform The Task (Paints, Abisol, Brushes, Replacement Rubber Seals, Handy Wrenches, Sandpaper, Solvents, Lubricants, Propellants For Equipment. 5. Participate In Periodic Spring And Autumn Inspections Of Flood Embankments). . 6. Maintenance Of 10 M Long Inlets And Outlets With The Mouth To The River/Stream And Desilting Of Inflows And Outflows From The Embankment Locks Along The Entire Section (Up To The Mouth To The Receiver). Potassium, Once A Year At The Beginning Of The Growing Season. In Doses Appropriate For Poor Soils. 8. Absolutely Manual Removal Of All Noticed Young Tree And Shrub Shoots And Reed Suckers, Preferably By Pulling Out A Fragment Of The Roots And Rhizomes. 9. Mowing The Inflow Ditches To The Embankment Locks Twice Over A Length Of 10 Meters And The Outflow Channels From The Embankment Locks Along With The Rake Along The Length As Described In Point 2.1 Along The Entire Section Of The Outflow Channels From The Embankment Locks On The Dates Specified By The Water Supervision Managers, 10. Mowing Twice Around Mileage Signs (Posts) On The Embankments Within The Deadlines Specified By The Supervisory Managers. 11. Maintenance And Painting Of Metal Parts Of Embankment Locks, Embankment Barriers, Warning Boards And Hectometer Posts On Individual Sections Of Embankments, Including Locks In The Embankment Body In Reinforced Concrete Chambers With A Wall Valve Closed Manually With A Crank. 12. Checking The Patency Of Embankment Culverts, Removing Garbage, Branches, Leaves And Other Various Contaminants From Under Flaps, Ducts And
|