Structural Engineering Consultancy Services - Assessment Of Compliance With The Requirements For Interoperability For The Project Doubling Of Sections On The Railway Line Plovdiv - Svilengrad - Border With The Republic Of Turkey. The Scope Of The Order Includes Checking The Compliance Of The Infrastructure Subsystem With The Infrastructure Tsi And The Lnp Tsi For The Design Stage And Checking The Compliance Of The Energy Subsystem With The Energy Tsi. The Project Technical Assistance For The Project Doubling Of Sections On The Railway Line Plovdiv - Svilengrad - Border With The Republic Of Turkey, In The Scope Of Which This Public Procurement Will Be Implemented, Has Been Approved For Financing Under The Connecting Europe Facility (Cef), As Between The Dp Nkži And Inea (Currently Cinea) Is The Agreement Inea/Cef/Tran/M2019/2088886 Dated 22.10.2020 For The Provision Of Grant-In-Aid. The Execution Of The Contract Covers The Following Tasks: Task 1: Verification Of The Compliance Of The Infrastructure Subsystem With The Infrastructure Tsi And The Lnp Tsi For The Design Stage; Task 2: Verification Of Compliance Of The Energy Subsystem With The Energy Tsi For The Design Stage. The Contractor Must Prepare And Submit To The Contracting Authority: - According To Task 1: Verification Of The Compliance Of The Infrastructure Subsystem With The Infrastructure Tsi And The Lnp Tsi For The Design Stage: The Task Requires The Issuance Of An Intermediate Certificate For Verification, According To Point 2.2 Of Appendix No. 1B Of Regulation No. 57 Of June 9, 2004 To Achieve Interoperability Of The National Railway System With The Railway System Within The Framework Of The European Union For The Infrastructure Subsystem In Relation To The Infrastructure Tsi And The Lnp Tsi For The Design Stage. The Assessment Is Carried Out On The Sg Module, According To Commission Decision 2010/713/Eu. The Compliance Check Includes An Assessment Of The Technical Project Submitted By The Contractor Under Contract No. 11401/22.04.2021 Development Of Layout Plans And Technical Project For The Project Doubling Sections Of The Krumovo - Svilengrad - Turkish Border Railway Line. Details Of The Scope And Requirements For The Technical Project Are Visible At The Following Internet Address: Zop.Rail-Infra.Bg:3737/Documentlist.Aspx?Sxhmtxofhwa%2Bfzfosbhtzf%2Brjqcwf7cy The Scope Of The Infrastructure Subsystem Includes: • Stations: Krumovo, Katunitsa, Popovitsa, Parvomai , Karadzhalovo, Yablkovo, Dimitrovgrad, Nova Nadezhda, Simeonovgrad, Harmanli, Lyubimets And Svilengrad; • Stops: Yagodovo, Kochovo, Sadovo, Vinitsa, Skobelevo, Stalevo, Krum, Chernogorovo, Konstantinovo, Preslavets, Harmanli Center And Biser; • Mezhdugaria: Krumovo - Katunitsa, Katunitsa - Popovitsa, Popovitsa - Parvomai, Parvomai - Karadzhalovo, Karadzhalovo - Yablkovo, Yablkovo - Dimitrovgrad, Dimitrovgrad - Nova Nadezhda, Nova Nadezhda - Simeonovgrad, Simeonovgrad - Harmanli, Harmanli - Lyubimets And Lyubimets - Svilengrad; • The Sections Svilengrad - Turkish Border And Svilengrad - Greek Border. - According To Task 2: Verification Of The Compliance Of The Energy Subsystem With The Tsi Energy For The Design Stage: The Task Requires The Issuance Of An Intermediate Certificate For Verification, According To Point 2.2 Of Appendix No. 1B Of Ordinance No. 57 Of June 9, 2004, To Achieve Interoperability Of The National Railway System With The Railway System Within The European One
|