Tenders are invited for Tender Opportunity: Provision of Deepwater Completion Services SCOPE OF WORK The successful contractors will provide Deepwater Completion Services for SDWPL. The scope of work for the services shall primarily include but not limited to the following: Contractor shall provide the completion equipment and services consisting of all services required to complete deviated or horizontal wells casing/liner sizes of 9-5/8 through 5 and open hole sizes of 12/4 through 6 with materials to include Corrosion Resistant Alloys. Contractor is expected to provide all equipment, tools and experienced personnel required to run completion services. These include but are not limited to: External casing packer, diverter tools, liner top packers, gravel pack equipment, production packers, and associated accessories, hydraulic flapper, bail and multi-positional type valves and all the necessary jewelries to run different completions including singles, duals, horizontals and multilaterals. Upper completion accessories to include gas-lift mandrels, gas-lift valves, downhole pressure/temperature gauges, chemical injection mandrels and valves, water injection valves, hydraulic control lines and TEC lines & spoolers, cross coupling clamps, deep-set surface controlled sub-surface safety valve (SCSSV) and associated specialty clamps, and intelligent well completion hardware/valves. External casing packers and diverter tools Liner top packers and associated accessories and running tools. Gravel packing equipment: wire wrapped (8 ga thru 12 ga) and premium (including 250 micron) screens, packers rated for at least 10Ksi, etc, circulation and gravel pack and frac packers completions, including unidirectional and bidirectional fluid loss devices capable of min, 10ksi burst and collapse. Complete service tool assemblies including cross over tools with proven rate and slurry test and in-country performance records showing erosion rates and slurry test and in country performance records showing erosion rates over time for specific conditions. Cross over systems, with dimensional space-outs recorded for gravel packing in 5-1/2, 7, 9-5/8, 11-3/4 and 13/-3/8 or 13-5/8 casing. Washpipe both plain and blast joint type, for high rate and high erosive velocity flow. Coatings that are proven compatible with given erosion velocity flow. Coatings that are proven for high rate and high erosive rates per fraction simulations. Handling tools, screen tables and all associated accessories. GP service tools with weight down circulating and 6 in packer bore capability. Downhole washpipe gauge systems Crossovers, pups, flow couplings, flow pups, and blast joints, proven with API and premium threads. Single and dual tubing completion equipment for 13-3/8 through 5 casings, packers, nipples, seal assembles etc, for both carbon steel and corrosion resistant alloy (Chrome) and/or internal plastic coated. Hydraulic flapper type SCSSV (metal-to-metal sealing ability) with wireline lock-out protective sleeves and wireline SCSSV insert. Annular isolation valves, mechanical and hydraulic fluid loss control valves. Contractor must provide the following personnel: Full-time Lagos-based completions technical services representatives required to consult with COMPANY drilling and petroleum engineers to design and plan completion installations as per COMPANYs direction. Technical completions engineering support personnel in Lagos for daily consultation with COMPANYs drilling and completions staff, and logistical coordination for required materials. Contractor will supply a Quality Pan outlining procedures to ensure that company receives equipment that has been properly prepared for utilization. Dedicated QA personnel will be supplied by contractor to ensure rigorous adherence to contractors quality plan. Quality plan will define shop equipment required to makeup and test completion equipment prior to shipment offshore. Contractor will be expected to maintain a base in Onne, Port Harcourt and/or Escravos to support companys operations. These services must be provided in strict accordance with SDWPLs established Standard Operating Procedures with a strong emphasis on safety and protection of people and the environment. CLOSE DATE: Only bidders who are pre-qualified and live with NJQS product/category in 3.04.17 (Well completions services) by 16:00 hours, 07 May, 2024 being the advert close date shall be invited to submit technical bid. Date Added: April 23, 2024 Deadline: 07/05/2024 Category: Engineering Services Tender Link : https://etenders.com.ng/star-deep-water-petroleum-limited-tender-opportunity-provision-of-deepwater-completion-services/
|