Insulation, Cold Room Doors And Docks, Refrigeration System And Ripening Equipment, Racking And Material Handling Equipment, Electrical Fittings And Cabling Etc. And Fire Detection Equipment Package Ii Construction Of Multipurpose Cold Storage And Ri , Supply, Installation & Testingof Puf Insulation With 100 Mm Puf Insulation Material For Chilled Cold Room 14 Nos. ( Dimesion 10.5 Mtr.X6.6Mtr.X12.0Mtr. ( H ) -Puf Panel For Wall & Ceiling Of 100 Mm Thickness, Inclussive Of All Accessories As Per Specifications -A ) Insulation Material -Puf Panels.B ) Density -40 + / - 2 Kg / M3c ) Thickness Of Sheet - 0.5 Mm Tct, Ppgid ) Total Thickness-100 Mme ) Thermal Conductivity -0.023 W / Mk F ) Compressive Strength -2.1 Kg / M2 ( At 10% Deformation ) F ) Make- Jindal, Rinac, Lioyd, Industrial Foams , Supply, Installation & Testing Of Chilled & Ripening Roomfloor With, Insulation Material- Puf Slab Of 80 Mm Thickness ( In 2 Layers Of 40 Mm Each ) , Vapour Barrier, Inclusive Of All Accessories And Chemical: - A ) Insulation Material - Puf Slab B ) Density - 40 + / - 2 Kg / M3 C ) No. Of Layers - 2 Layers ( 40 Mm Each ) D ) Total Thickness - 80 Mm E ) Vapor Barrier - Tarfelt, Polythene Sheet 250 Micron Thick F ) Make- Jindal, Rinac, Lloyd, Bnal, Industrial Foams , Supply, Installation & Testing Of Puf Insulation With 150 Mm Puf Insulation Material For Freezer Cold Room 07 Nos. ( Dimesion 10.5 Mtr.X6.6Mtr.X12.0Mtr. ( H ) -Puf Panel For Wall & Ceiling Of 150 Mm Thickness, Inclussive Of All Accessories As Per Specifications -A ) Insulation Material -Puf Panels.B ) Density -40 + / - 2 Kg / M3c ) Thickness Of Sheet - 0.5 Mm Tct, Ppgid ) Total Thickness-150 Mme ) Thermal Conductivity -0.023 W / Mk F ) Compressive Strength -2.1 Kg / M2 ( At 10% Deformation ) F ) Make- Jindal, Rinac, Lioyd, Industrial Foams , Supply, Installation & Testing Of Freezer Cold Room Floor With, Insulation Material- Puf Slab Of 120 Mm Thickness ( In 2 Layers Of 60 Mm Each ) , Vapour Barrier, Inclusive Of All Accessories And Chemical: - A ) Insulation Material - Puf Slab B ) Density - 40 + / - 2 Kg / M3 C ) No. Of Layers - 2 Layers ( 60 Mm Each ) D ) Total Thickness - 120 Mm E ) Vapor Barrier - Tarfelt, Polythene Sheet 250 Micron Thick F ) Make- Jindal, Rinac, Lioyd, Bnal, Industrial Foams , Supply, Installation & Testing Of Puf Insulation With 80 Mm Puf Insulation Material For Ripening Room 14 Nos. ( Dimesion 10.0 Mtr.X5.0Mtr.X3.5Mtr. ( H ) Loading & Unloading Area, Ante Chamber Etc-Puf Panel For Wall & Ceiling Of 80 Mm Thickness, Inclussive Of All Accessories As Per Specifications -A ) Insulation Material -Puf Panels.B ) Density -40 + / - 2 Kg / M3c ) Thickness Of Sheet - 0.5 Mm Tct, Ppgid ) Total Thickness-80 Mme ) Thermal Conductivity -0.023 W / Mk F ) Compressive Strength -2.1 Kg / M2 ( At 10% Deformation ) F ) Make- Jindal, Rinac, Lioyd, Industrial Foams , Supply, Installation, Testing And Commisssioning Of Hinge Door For Ripening Room, 80Mm Thickness, Dimensions -1200 Mm X 2100Mmcomplete With All Accessories As Per Specification :- Type Of Door -Swing Door B ) Dimensions-1200 X 2100Mm C ) Type Of Panel-Sandwich Panels Constructed Of A Core Of 80 Mm Puf On Both Sides Covered With 0.6 Mm Galvanized Steel Plate Finished With 20Mucoating. The Panels Are Supplied With Thermal Bridge-Free Pvc Surrounding Profiles D ) Sealing -All Round With Triple Rubber Profile E ) Colour Outside-Ral 9002 ( White ) F ) Colour Inside-Standard Colour Ral 9002 ( White / Grey ) G ) Hardware-Galvanised Steel H ) Finish Of Opening-To Be Included I ) Door Operation - Manual J ) Locking Arrangement -To Be Included K ) Emergency Door Opening- To Be Provided ( Make: Shakti Hormann, Metaflex, Infraca, Hicon ) , Supply, Installation, Testing And Commisssioning Of Motorised Horizontal Automatic Sliding Door For Freezer Cold Room, 150Mm Thickness, Dimensions -2400 Mm X 4600Mm ( Clear ) Complete With All Accessories As Per Specification:- A ) Door Size: 2400 Mm X 4600 Mm B ) Complete With All Accessories, Thickness Of Insulation – 1.2 Mm Minimum C ) No. Of Cycle- 500 / Day D ) Control Panel - Plastic Control Cabinet Ip65, Travel Limit Adjustment, Membrane Push Button Open Emergency Stop-Close With Integral Automatic Timer Sheet Thickness For Door 1.2Mm Minimum E ) Safety Devices - Two Pair Of Safety Photocell F ) Surface Door Closer To Be Provided G ) Curtain - Made From Modular Section H ) Vertical Pullman Latch With Rod And Cover Modular To Be Provided I ) Single Point Surface Panic Push Bar To Be Provided J ) Door Operation – Soft Based Canopy Cover ( Make: Shakti Hormann, Metaflex, Infraca ) , Supply, Installation, Testing And Commisssioning Of Motorised Horizontal Automatic Sliding Door, 80Mm Thickness, Dimensions -2400 Mm X 4600Mm ( Clear ) Complete With All Accessories As Per Specification:- A ) Door Size: 2400 Mm X 4600 Mm B ) Complete With All Accessories, Thickness Of Insulation –80 Mm Minimum C ) No. Of Cycle- 500 / Day D ) Control Panel - Plastic Control Cabinet Ip65, Travel Limit Adjustment, Membrane Push Button Open Emergency Stop-Close With Integral Automatic Timer Sheet Thickness For Door 1.2Mm Minimum E ) Safety Devices - Two Pair Of Safety Photocell F ) Surface Door Closer To Be Provided G ) Curtain - Made From Modular Section H ) Vertical Pullman Latch With Rod And Cover Modular To Be Provided I ) Single Point Surface Panic Push Bar To Be Provided J ) Door Operation – Soft Based Canopy Cover ( Make: Shakti Hormann, Metaflex, Infraca ) , Supply, Installation, Testing And Commisssioning Of Horizontal Automatic Sliding Door For Antechamber, 80Mm Thickness, Dimensions -1800 Mm X 2400Mm ( Clear ) Complete With All Accessories As Per Specification:- Type Of Door -Manual Sliding Door B ) Dimensions-1800 X 2400Mm C ) Type Of Panel-Sandwich Panels Constructed Of A Core Of 80 Mm Puf On Both Sides Covered With 0.6 Mm Galvanized Steel Plate Finished With 20Mucoating. The Panels Are Supplied With Thermal Bridge-Free Pvc Surrounding Profiles D ) Sealing -All Round With Triple Rubber Profile E ) Colour Outside-Ral 9002 ( White ) F ) Colour Inside-Standard Colour Ral 9002 ( White / Grey ) G ) Hardware-Galvanised Steel H ) Track Rail -Drop / Lift Rail System I ) Finish Of Opening-To Be Included J ) Door Operation - Manual K ) Locking Arrangement -To Be Included L ) Emergency Door Opening- To Be Provided ( Make: Shakti Hormann, Metaflex, Infraca ) , Supply, Installation, Testing And Commissioning Ofante-Chamber High Speed Roll Up Door Size- ( 4500Mmx2400mm ) As Per Specifications:- A ) Door Size: 2400 Mm X 4600 Mm Of Insulation Thickness 1.3Mm Thick Polyester Fabric Pvc Coated ( Self Extinguishing ) , Galvanised Steel Painted Side Guides And Frame B ) Complete With All Accessories, Thickness Of Insulation – 1.2 Mm Minimum C ) No. Of Cycle- 500 / Day D ) Control Panel - Plastic Control Cabinet Ip65, Travel Limit Adjustment, Membrane Push Button Open Emergency Stop-Close With Integral Automatic Timer Sheet Thickness For Door 1.2Mm Minimum E ) Safety Devices - Two Pair Of Safety Photocell F ) Surface Door Closer To Be Provided G ) Curtain - Made From Modular Section H ) Vertical Pullman Latch With Rod And Cover Modular To Be Provided I ) Single Point Surface Panic Push Bar To Be Provided J ) Door Operation – Soft Based Canopy Cover ( Make: Shakti Hormann, Metaflex, Infraca ) , Supply, Installation, Testing And Commissioning Of Hydraulic Dock Leveller Of Size 2000Mm X 2500Mm With 6 Mt Capacity As Per Specifications:- A ) Overall Dimension: 2000Mm X 2500Mm B ) Operator And Control Unit: Electro Hydraulic Operator 415V- 3 Phase, 50Hz And Control Voltage 24V With Minimum Ip54 Protection. Membrane Push Button With Press And Hold Actuation And Emergency Stop Integrated In Ip65 Enclosure. C ) Dl Upwards Movement – As Per European Standard D ) Dl Downward Movement - As Per European Standard E ) Hydraulic Cylinder – 2 Nos. F ) Load Capacity – 6 Mt ( Dynamic Load ) G ) Temperature Range Of Operations – 5 To 10 Deg C H ) Foot Protection Plates On Sides – As Per En1398 I ) Lip Length – 405Mm Min. ( Make: Metaflex, Shakti Hormann, Godrej, Gandhi Automation ) , Supply, Installation, Testing And Commissioning Of Automatic Overhead Sectional Door Of Size 2500Mm X 3000Mm As Per Specifications:- A ) Overall Dimension: 2500Mm X 3000Mm B ) Material - Door Leaf Galvanised Steel, 0.5 Mm Ppgi, Double-Skinned, 40Mm C ) Door Construction - Self-Supporting D ) Closing Edge Safety Device - Sensor Controlled Safety Devices To Monitor The Bottom Edge Of The Door. Instant Stoppage And Reversing On Encountering Any Obstruction While Closing. E ) Colors - Inside Panel & Outside Color Is Standard Ral 9002. F ) Operation - Normal Lift Elevation Considering Room Height ( Make: Metaflex, Shakti Hormann, Infraca ) , Supply, Installation, Testing And Commissioning Of Rectractable Dock Shelter Of Size 3450Mm X 3400Mmas Per Specifications:- A ) Overall Dimension: 3400Mm X 3400Mm ( Depth 500Mm ) + / - 100Mm ( Clear Opening - 2110X2400mm B ) Link Arm Construction With Link Arms Fitted On Back Frame. C ) 3-Side Front And Back Frame Made Of Galvanized Steel Profiles D ) Flexible Frame Connection By Link Arms Made Of Galvanized Steel Profiles E ) Side And Top Flaps: To Be Fixed By Using Weather Strip Anodized Locating Profiles ( Make: Metaflex, Shakti Hormann, Gandhi Automation, Infraca ) , Supply, Installation, Testing, Commissioning Of Refrigeration System Of Suitable Capacity ( Reference Capacity Compressor Rack Of 360Kw For 14 Nos Chilled Rooms, 07 Nosfreezer Rooms ( When Operating As Chiller Rooms ) , 1 No In Ante Chamber And 1 No In Loading Unloading Area. The 07 Nos. Of Freezer Rooms Will Be Connected With This Rack To Allow Operationas Dual Temperature Complete With All Accessories. The Screw Compressor Rack With 3 Compressorson Freon 404A Should Be Based On Design Temperature – Evaporation For -5 Deg C, Condensing 50 Deg C. The Multiple Screw Semi-Hermetic Compressor Rack Unit Should Be Originally Made And Assembled By The Compressor Manufacturer. For Positive Storage ( Makes- Bitzer, Bock, Frascold, Emerson, Carrier ) The Following Acessories And Specifications Etc Should Be Ensured: 1.Control Panel For All Cold Room ( Plc Controls Type ) To Have Following Features – Starting Arrangement For Compressor ( Hp / Lp / Op Cut Out For Each Compressor ) Crankcaseheater To Operate When Compressor Is Stopped And Off When Running. Lighting Main Switch Also In The Panel. This Will Have All Starters With Interlocking System. Push Buttons For Start / Stop. Humidifier & Ethylene Scrubber Switches Also In The Panel.Overload Relays & Fuses, Name Plates, Complete Cabling From Lt Panel For The Refrigeration System. The Elecrical Refrigeration Panel Will Be Common For Whole Facility With 21 Cold Rooms And 04 Ripening Chambers, Ante Room, Loading Unloading Area. 2. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass, 3. Refrigeration Piping Work: A ) The Piping Shall Be Of Refrigeration Quality Seamless Copper Tubes And The Valves Shall Be Brassoma B ) Make: Henry / Danfoss / Sporlan / Carel C ) The Piping Shall Include Accessories Such As Filter, Drier, Sight Glass, Suction / Liquid Heat Exchanger, Suction Line Accumulator. D ) Adequate Number Of Supports Shall Be Included. E ) The Suction And Discharge Lines Shall Be Designed For A Maximum Pressure Drop Corresponding To 1.1 Deg. C Drop In Saturated Evaporating And Condensing Temperatures. F ) The Liquid Line Shall Be Designed For Maximum Pressure Drop Corresponding To A Drop 0.5 To 1Deg. C In Saturation Temperature. G ) The Piping Shall Be Designed With Proper Slope In The Direction Of Refrigerant Flow And To Ensure Proper Oil Return To The Compressor And Should Be Installed With Adequate Supports To Avoid Undue Vibration. H ) The Piping Should Be Thoroughly Cleaned As Per Standard Practice Prior To Installation. I ) Minimum Thickness Of Copper Pipe: 16 G 4. Refrigeration Line Insulation:- Refrigerant Line Will Be Insulated With Epdm Or Xlpe. Insulation With Aluminum Foil Cladding / Weatherproof Cladding; E.G. Woven Glass Cloth With Epoxy Coating Or Arma Check / Cladding With Suitable Fittings And Adhesives. 5. Drain Water Piping For Air Cooling: The Evaporator Unit Shall Be Provided With Pvc Drain Complete With Fittings And Supports With Utraps As Per Requirement Leading To The Main Drain As Per Approved Layout. 6. Plc System Should Be Provided For Monitoring And Control Of Operations With Following : - Communication Ports Embedded - Usb 2.0 ( With Usb Adapter ) Base Analog - Four 24V Dc Digital Inputs Are Shared As 0…10V Analog Inputs Types Of Accessories Or Plug-Ins Supported - Lcd Display With Backup Memory Module Usb Adapter Power Supply - Embedded 120 / 240V Ac And 12 / 24V Dc Options Two Plug-In Module Slots Microsd Card Slot For Project Backup And Restore, Data Logging, And Recipe Embedded 10 / 100 Base-T Ethernet Port Support For Remote Lcd Module For Configuration Embedded Non-Isolated Combo Serial Port Modbus Rtu Protocol ( Serial Port ) Modbus Tcp Support Ethernet / Ip Support, Cip Serial Support Controller Of Plc:- Up To Six Embedded High-Speed Counter Inputs ( Hsc ) ( A ) 100 Khz Speed Hsc Available On 24V Dc Models Up To Three Embedded Pulse Train Outputs ( Pto ) For Basic Positioning ( B ) High-Speed Input Interrupts Modbus Rtu Protocol ( Serial Port ) Cip Serial To Allow Tighter Integration With Panelview™ Component Embedded Usb Programming And Serial Port Plug-In Slots To Customize According To Needs 7. Accessories:- Oil Separator With Level Switch, Oil Heater, Pressure Relief Valve, Motor Protection Devices. Liquid Receiver With Pressure Relief Valve.Liquid Filter Drier & Liquid Sight Glass. High Low-Pressure Switch. Economiser Fitted On Each Compressor. Superheat Indication Compulsory On Display. 8. Make Of Electrical Cables For All Connecting Cables- Polycab, Havells, Finolex, Kei , Supply, Installation, Testing, Commissioning Of Refrigeration System Of Suitable Capacity ( Reference Capacity Compressor Rack Of 100Kw For 07 Nos. Freezer Rooms Operating At -25 Deg C Complete With All Accessories. The Screw Compressor Rack With 2 Compressorson Freon 404A Should Be Based On Design Temperature – Evaporation For -30 Deg C, Condensing 50 Deg C. The Multiple Screw Semi-Hermetic Compressor Rack Unit Should Be Originally Made And Assembled By The Compressor Manufacturer For Freezer Storage. The System Should Be Provided With All Spares To Allow For Dual Temperature Operations Of The Freezer Rooms. ( Makes- Bitzer, Bock, Frascold, Emerson, Carrier ) The Following Accessories And Specifications Etc Should Be Ensured: 1.Control Panel For All Cold Room ( Plc Controls Type ) To Have Following Features – Starting Arrangement For Compressor ( Hp / Lp / Op Cut Out For Each Compressor ) , Crank Caseheater To Operate When Compressor Is Stopped And Off When Running. Lighting Main Switch Also In The Panel. This Will Have All Starters With Interlocking System. Push Buttons For Start / Stop. The Elecrical Refrigeration Panel Will Be Common For Whole Facility With 21 Cold Rooms And 04 Ripening Chambers, Ante Room, Loading Unloading Area. 2. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass, 3. Refrigeration Piping Work A ) The Piping Shall Be Of Refrigeration Quality Seamless Copper Tubes And The Valves Shall Be Brassoma B ) Make: Henry / Danfoss / Sporlan / Carel C ) The Piping Shall Include Accessories Such As Filter, Drier, Sight Glass, Suction / Liquid Heat Exchanger, Suction Line Accumulator. D ) Adequate Number Of Supports Shall Be Included. E ) The Suction And Discharge Lines Shall Be Designed For A Maximum Pressure Drop Corresponding To 1.1 Deg. C Drop In Saturated Evaporating And Condensing Temperatures. F ) The Liquid Line Shall Be Designed For Maximum Pressure Drop Corresponding To A Drop 0.5 To 1Deg. C In Saturation Temperature. G ) The Piping Shall Be Designed With Proper Slope In The Direction Of Refrigerant Flow And To Ensure Proper Oil Return To The Compressor And Should Be Installed With Adequate Supports To Avoid Undue Vibration. H ) The Piping Should Be Thoroughly Cleaned As Per Standard Practice Prior To Installation. I ) Minimum Thickness Of Copper Pipe: 16 G 4. Refrigeration Line Insulation:- Refrigerant Line Will Be Insulated With Epdm Or Xlpe. Insulation With Aluminum Foil Cladding / Weatherproof Cladding; E.G. Woven Glass Cloth With Epoxy Coating Or Arma Check / Cladding With Suitable Fittings And Adhesives. 5. Drain Water Piping For Air Cooling: The Evaporator Unit Shall Be Provided With Pvc Drain Complete With Fittings And Supports With Utraps As Per Requirement Leading To The Main Drain As Per Approved Layout. 6. Plc System Should Be Provided For Monitoring And Control Of Operations With Following : - Communication Ports Embedded - Usb 2.0 ( With Usb Adapter ) Base Analog - Four 24V Dc Digital Inputs Are Shared As 0…10V Analog Inputs Types Of Accessories Or Plug-Ins Supported - Lcd Display With Backup Memory Module Usb Adapter Power Supply - Embedded 120 / 240V Ac And 12 / 24V Dc Options Two Plug-In Module Slots Microsd Card Slot For Project Backup And Restore, Data Logging, And Recipe Embedded 10 / 100 Base-T Ethernet Port Support For Remote Lcd Module For Configuration Embedded Non-Isolated Combo Serial Port Modbus Rtu Protocol ( Serial Port ) Modbus Tcp Support Ethernet / Ip Support, Cip Serial Support Controller Of Plc:- Up To Six Embedded High-Speed Counter Inputs ( Hsc ) ( A ) 100 Khz Speed Hsc Available On 24V Dc Models Up To Three Embedded Pulse Train Outputs ( Pto ) For Basic Positioning ( B ) High-Speed Input Interrupts Modbus Rtu Protocol ( Serial Port ) Cip Serial To Allow Tighter Integration With Panelview™ Component Embedded Usb Programming And Serial Port Plug-In Slots To Customize According To Needs 7. Accessories:- Oil Separator With Level Switch, Oil Heater, Pressure Relief Valve, Motor Protection Devices. Liquid Receiver With Pressure Relief Valve.Liquid Filter Drier & Liquid Sight Glass. High Low-Pressure Switch. Economiser Fitted On Each Compressor. 8. Superheat Indication Compulsory On Display. Make Of Electrical Cables For All Connecting Cables- Polycab, Havells, Finolex, Kei , Supply, Installation, Testing, Commissioning Of Refrigeration System Of Suitable Capacity ( Reference Capacity 17 Kw For Each Room ) For The 04 Nos Ripening Rooms. The Complete Dx Type Refrigeration System Based On Freon 404A With Semi Hermetic Compressors For Each Ripening Chamber With All Spares Should Be As Perdesign Temperature – Evaporation For Chilled Cold Rooms 10 Deg C, Condensing 50 Deg C Complete With All Accessories. 1. Compressor ( Semi Hermetic ) Of Required Capacity With Air Cooled Condenser. Fans To Be Controlled By Temp Controller, Suction 15 / 8”, Liquid 7 / 8”. Compressor – Semi Hermetic ( 1 Per Ripening Room ) With Capacity Total Capacity Of 17 Kw Per Chamber. ( Makes- Bitzer, Bock, Frascold, Emerson, Carrier ) 2. Evaporator Of Required Capacity ( 17 Kw ) 1 Per Chamber In Each Ripening Chamber With Around 02 Axial Fans Of Around 500Mm, Fin Spacing Around 6 Fpi. Desired Air Volume Around 30000 M3 / Hr ( Makes – Luve, Patton, Guntner, Star Cooler ) 3. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass 4. The Elecrical Refrigeration Panel Will Be Common For Whole Facility With 21 Cold Rooms And 04 Ripening Chambers, Ante Room, Loading Unloading Area, Humidifier & Ethylene Scrubber Switches Also In The Panel Overload Relays & Fuses, Name Plates, Complete Cabling From Lt Panel For The Refrigeration System. 5. Refrigeration Piping Work A ) The Piping Shall Be Of Refrigeration Quality Seamless Copper Tubes And The Valves Shall Be Brassoma B ) Make: Henry / Danfoss / Sporlan / Carel C ) The Piping Shall Include Accessories Such As Filter, Drier, Sight Glass, Suction / Liquid Heat Exchanger, Suction Line Accumulator. D ) Adequate Number Of Supports Shall Be Included. E ) The Suction And Discharge Lines Shall Be Designed For A Maximum Pressure Drop Corresponding To 1.1 Deg. C Drop In Saturated Evaporating And Condensing Temperatures. F ) The Liquid Line Shall Be Designed For Maximum Pressure Drop Corresponding To A Drop 0.5 To 1Deg. C In Saturation Temperature. G ) The Piping Shall Be Designed With Proper Slope In The Direction Of Refrigerant Flow And To Ensure Proper Oil Return To The Compressor And Should Be Installed With Adequate Supports To Avoid Undue Vibration. H ) The Piping Should Be Thoroughly Cleaned As Per Standard Practice Prior To Installation. I ) Minimum Thickness Of Copper Pipe: 16 G 6. Refrigeration Line Insulation:- Refrigerant Line Will Be Insulated With Epdm Or Xlpe. Insulation With Aluminum Foil Cladding / Weatherproof Cladding; E.G. Woven Glass Cloth With Epoxy Coating Or Arma Check / Cladding With Suitable Fittings And Adhesives. 7. Drain Water Piping For Air Cooling: The Evaporator Unit Shall Be Provided With Pvc Drain Complete With Fittings And Supports With Utraps As Per Requirement Leading To The Main Drain As Per Approved Layout. 8. Accessories:- Oil Separator With Level Switch, Oil Heater, Pressure Relief Valve, Motor Protection Devices. Liquid Receiver With Pressure Relief Valve.Liquid Filter Drier & Liquid Sight Glass. High Low-Pressure Switch. Economiser Fitted On Each Compressor. 9. Make Of Electrical Cable For All Connecting Cables - Polycab, Havells, Finolex, Kei 10. The Support Structure And Civil Work For Hanging Of Outdoor Unit Will Be In The Scope Of Contractor At Marked Location. 11. Ventilation System Will Be Provided In Each Ripening Chamber. 12. Hanging Arrangements For Evaporators From Peb Building Rafters Will Be In Contractor Scope , Supply, Installation, Testing, Commissioning Of Evaporators Of Suitable Capacity ( Reference Capacity Evaporator Of 40Kw Each In 14 Nos Of Chilled Cold Rooms. 1. Evaporator Of Required Capacity Of 40 Kw ( 1 Per Cold Room In Chilled Cold Rooms With Around 2 Axial Fans Of Around 600Mm, Fin Spacing Around 4 Fpi. Desired Air Volume Around 39000 M3 / Hr ( Makes – Luve, Patton, Guntner, Star Cooler ) 2. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass Etc As Required 3.Make Of Electrical Cable For All Connecting Cables - Polycab, Havells, Finolex, Kei 4.Hanging Arrangements For Evaporators From Peb Building Rafters Will Be In Contractor Scope , Supply, Installation, Testing, Commissioning Of Evaporators Of Suitable Capacity ( Reference Capacity Evaporator Of 30Kw Each In 07 Nos Of Frozen Cold Rooms, Two Nos. In Each Cold Room With 15 Kw Capacity. The Evaporator Installation And Piping Will Be As Per Dual Temperature Requirements And All Connection Required With Both Compressor Racks ( Chilled & Frozen ) And Switching Arrangement. 1. Evaporator Of Required Capacity Of 30 Kw ( 2 Per Cold Room 15 Kw Each In Frozen Cold Rooms For Dual Application With Arounf 2 Axial Fans Of Around 500Mm, Fin Spacing Around 4 Fpi. Desired Air Volume Around 14000 M3 / Hr. ( Makes – Luve, Patton, Guntner, Star Cooler ) 2. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass As Required 3. Make Of Electrical Cable For All Connecting Cables- Polycab, Havells, Finolex, Kei 4. Hanging Arrangements For Evaporators From Peb Building Rafters Will Be In Contractor Scope. , Supply, Installation, Testing, Commissioning Of Evaporators Of Suitable Capacity ( Reference Capacity Evaporator Of 9.5Kw Inside Ante Chamber Of Frozen Cold Room And 10.5Kw Inside Loading-Unloading Area Of Frozen Cold Room. ( Makes – Luve, Patton, Guntner, Star Cooler ) 1. These Evaporators Are To Be Connected With The Chilled Rack Compressors 2. Controls, Thermostat, Solenoid Valve, Valve, Sight Glass As Required 3. Make Of Electrical Cable For All Connecting Cables- Polycab, Havells, Finolex, Kei 4. Hanging Arrangements For Evaporators From Peb Building Rafters Will Be In Contractor Scope. , Supply, Installation, Testing, Commissioning Of Water Cooled Condenser For Refrigeration System Of Suitable Capacity ( Reference Capacity 500Kw ) For 14 Nos Of Chilled Cold Rooms And Ante-Chambers. Desired Water Cooled Condenser Capacity - 500 Kw And Air Volume Around 45 M3 / S For 14 Nos. Chilled Cold Rooms. ( Makes- Alfa Level, Bitzer, Heatcraft ) . The Structure, Civil Work And Water Pipeline For Condenser Will Be In The Scope Of Contractor As Per Marked Location. , Supply, Installation, Testing, Commissioning Of Water Cooled Condenser For Refrigeration System Of Suitable Capacity ( Reference Capacity 200Kw ) For 07 Nos Of Frozen Cold Rooms. Desired Water Cooled Condenser Capacity - 200 Kw And Air Volume Around 39000 M3 / Hr For Frozen Cold Rooms. ( Makes- Alfa Level, Bitzer, Heatcraft ) . The Structure, Civil Work And Water Pipeline For Condenser Will Be In The Scope Of Contractor As Per Marked Location. , Supply, Installation, Testing And Commissioning Of Portable Ethylene Generator Connected To An Electrical Plug Point Inside The Room, The Ethylene Generator Should Be Suitable For Providing Suitable Levels Of Ethylene ( As Per The Fruit Category ) In Ripening Rooms Of Volume Around 175 Cum By Catalytic Dehydration Of Developing Liquid Into Ethylene Gas Complete With Suitable Developing Liquid Required For Commercial Ripening Applications For Each Of The Ripening Rooms As Per Specification Alongwith 5 Ltr Of Developing Liquid Ethylene With Each Generator.Make: Aseko, Genet, Vantec , Supply, Installation, Testing And Commissioning Of Ethylene Gas Sensor Complete With Display In All 4 Ripening Rooms Of Catalytic Type With Measuring Range Upto 2000 Ppm For Ripening Room Application As Per Specification. Make- Aseko, Msr, Sensorex , Supply, Installation, Testing And Commissioning Of Co2 Gas Sensors Complete With Display In All 4 Ripening Rooms Of Infrared Type With Measuring Range 0 – 5%Suitable For Ripening Application As Per Specification. Make- Aseko, Msr, Sensorex , Supply, Installation, Testing And Commissioning Ofultrasonic Humidifier System For Ripening Rooms With Suitable ( 01 Nos. In Each Room ) Capacityas Per Specifications , Supply, Installation, Testing & Commissioning Of Ethylene Scrubber System In Each Of 14 Nos Chilled Cold Room To Allow For Mixed Storage Of Fruits And Vegetables To Protect Product Quality During Storage Due To Ethylene, Minimum Ethylene Absorption Capacity Of Media: 4+ Litres / Kg. As Pertest Certificate From An Accredited Laboratory. Media Should Be Packed Tightly In Modules That Fit Inside The Ethylene Scrubber And Contractor Will Provide A Spare Kit Of Media. The System Should Be Suitable For Cold Room As Per Specification Make - Green Keeper, Be Fresh , Supply, Installation, Testing And Commissioning Of G+5 Shutle Racking Structure For In 14 Nos. Chilled Cold Rooms And 07 Nos. Frozen Cold Rooms With Total Nos. Of Pallet Poisition In Shuttle Racking Will Be 3528 Pallets - 168 Pallets X 21 Rooms ) As Per Specification:- The Storage Of Frozen Foods, Butter, Ice Cream, Fruits And Other Perishable Commodities In Pallets Has Been Planned At Six Levels Within The Chilled And Frozen Cold Rooms Viz. Ground Plus 05 Racking Level At An Elevation Of 1500Mm Plus Without Shuttle Height Which Can Be Accommodated Within These Rooms Having Internal Height Of 12.0 M. Heavy Duty Racking Frame Arrangements Must Be Provided Within The Cold Rooms. The Heavy Duty Racking ( Ms Painted In Any Durable Long Lasting Colour With Anti Rusting Treatment And Powder Coated Finish Suitable For High Humidity Conditions In Cold Rooms With Load Bearing Capacity Of 1000 Kg Per Pallet. Racking System Will Have Five Nos. Of Shuttle With Additional Battery Bank And Charger With Each Shuttle. The System Will Be Suitable For 168 Pallets Storage Per Chamber . 1. All Basic Structural Components Of The System Such As Column, And Beams Should Be Conform To Latest Euro Code En15512 Standard / Equivalent. 2. Components & Raw Material Used For Construction Of Shuttle Racks System And Load Bearing Members Of The System To Be Made Out Of High Strength Hr Steel Having Properties Equivalent To Grades Specified By Is 5986:2002 / Is 2062:2006 / Equivalent. Upright : Is: 5986 – Ish430la Or Equi , 355 Mpa, Beam: Is: 5986 – Ish410s Or Equi , 255 Mpa The Different Types Of Material Used For Load Bearing Members Such As Uprights And Beams Should Have Minimum Guaranteed Yield Strength Of 355Mpa. ( Reference Steel Type Is:5986-Fe 410 / Equivalent Or Is:2062-E 350 / Equivalent ) . The Raw Material Used For Structural Load Bearing Members Should Have Necessary Impact Strength For Cold Room Applications Of Upto -25 Deg C. 3. Fasteners Used Should Be With Galvanized Finish Suitable For Cold Store Application. 4. All Powder Coated Components Should Have A Proper Anti-Rust Treatment To Ensure Long Life And Protection From Corrosion In High Humidity Conditions In Cold Room. The Final Paint Finish Should Be Tested As Per Is 101:1964 / Equivalent. 5. Installation Of Shuttle Rack System: The Shuttle Rack System Should Be Provided In Knock Down Condition To Be Assembled And Installed At Site. The Complete System Should Grouted On Floor Using Expansion Bolts Considering That It Is To Be Installed Within Cold Rooms Where No Welding Can Be Permitted Neither Puncture Of Insulation Laid Below The Cold Room Floor. Shuttle ( 03 Nos. For Chilled Cold Storage Application Of 0 Deg C And 02 Nos. For Frozen Storage Application Of -25 Deg C Application, Total - 05 Nos. ) Functions To Be Provided In Shuttle: Feature Should Be In Shuttle Remote Like - Start Stop, Low Battery Warming, Failure Warning, Running Deceleration Sensor, Road Wheel - 4, Battery Cover Additional Battery And Charger Will Be Provided With Each Shuttle. Bollards To Be Provided In Cold Rooms For Protection From Accidental Damage / Collison Of Forklift Movement. Protective Bollards Grouted In Floor Of Ante-Chamber Passage Complete With Paint Finish Of Suitable Strength For Protection Against Accidental Damage To Cold Rooms Walls And Doors By Forklift Movement. Erp Software Loaded On Computer Shall Be Provided To Record And Monitor The Placement Of Pallets In Various Pallet Positions Across All The Cold Rooms For Easy Monitoring And Opertionsnote: The Total Reference Tonnage Of Steel For Complete Shuttle Rack System Frame In Each Cold Room And Execution Drawing Shall Be Approved By Site Engineer. 6. Standards – A ) Shuttle Racking Component Design As Per En 15512 Racking Standard B ) European Code -Stringent Safety Factors, Which Ensures A Safer Rack, Durable & Reliable. C ) Oem Should Adhere Tofollowing Design Standard. D ) Bs5950-5:1998 – Code Of Practice For Design Of Cold Formed Thin Gauge Sections E ) Fem 10.2.02 – The Design Of Static Steel Pallet Racking F ) Fem 10.3.01 – Adjustable Beam Pallet Racking, Tolerances, Deformations And Clearances G ) En: 15512: 2009 – Steel Static Storage Systems - Adjustable Pallet Racking Systems – Principles For Structural Design., 7. Manufacturing A ) Oem Should Have The In-House Manufacturing Capability To Process And Manufacture Cold Rolled Essential Components Of The Racking System. Details To Be Provided By Bidder B ) Oem Should Have In-House Production Capability For Slitting, Blanking, Shearing Lines. C ) Oem Should Have Raw Material Of Upright, Beam And Guide Rail Should Be Tested From Nabl Approved Lab Of Every Component To Their Original Raw Material For The Storage Racking System. D ) Oem Should Have Experienced Design, R&D Facility In The Field Of Storage System. The Evidence Shall Include: 3. Eco Friendly Supplier – A ) Paint Supplied Must Be Lead Free – Certification Of The Paint Manufacturer To Be Attached 8. Shuttle Racking Specs – A ) Shuttle Support Beams Deformation Is Restricted To 5Mm In Design B ) Shuttle Racking Component Design As Per En 15512 Racking Standard C ) Supply Of The Entire Bid Quantity In Single Lotwithout Splitting Of Order D ) Compliance To All Design Standards Relevant To The Supply - Oem Must Be Following Quality Design Standards And Relevant Design Patents To Prove Superior Product. E ) Upright: Shall Be Manufactured From Hr Steel As Per Is2062 / Is1079 Confirming To 355Mpa. F ) Omega Profile ( 100 Mm X 70Mm X 2Mm ) , Rolled Formed, 12 Bend, Single Piece. G ) Beam, Base Plate: Shall Be Manufactured From Hr Is2062 / Is1079 Grade Steel, , Supply, Installation, Testing And Commissioning Of 03 Nos. Shuttle For G+5 Shutle Racking Structure For In 14 Nos. Chilled Cold Rooms Positive Temperature 0 Deg C As Per Specification:- ( Make: Godrej, Automa, Adverb, Craftman ) 1. Standard Shuttle Weight 230 Kg ( Approximate ) Standard Carrying Load 1500 Kg Temperature Range For Chilled Cold Room0°C To +45°C Humidity ( St & Bz ) 10% To 85% ( Not Condensed ) Wheels 4 / 8 Wheels ( Polyurethane ) Battery Type Litio ( Lithium-Ion Battery ) Min. Charging Life Min 900 Charging ( Battery Life Of 4 To 5 Years ) Battery Working Range 8 To 10 Hours ( Room Temperature ) Charging Time 100% 5 Hours2. Remote Controller: A ) Manage Up To 4 Shuttles. Remote Control Radio Frequency Power Supply Rechargeable Battery Protection Ip65 Temperature Range0°C To 45°C Working Range Up To 60Meter Stand By Function Standby Mode Active After 3 Min Of Not Use. A ) Shuttle Should Be Able To Count The Pallets In Single Or Multiple Racks . The Overall Number Of The Pallets On The Rack Or In The Warehouse Is Shown On The Display Of The Transmitter. , Supply, Installation, Testing And Commissioning Of 02 Nos. Shuttle For G+5 Shutle Racking Structure For In 07 Nos. Frozen Cold Rooms Negative Temperature -25 Deg C As Per Specification:-Shuttle Equipment: ( Make: Godrej, Automa, Adverb, Craftman ) ( Make: Godrej, Automa, Adverb, Craftman 1. Standard Shuttle Weight 230 Kg ( Approximate ) Standard Carrying Load 1500 Kg Temperature Range For Frozen Cold Room-25°C To -1°C Humidity ( St & Bz ) 10% To 85% ( Not Condensed ) Wheels 4 / 8 Wheels ( Polyurethane ) Battery Type Litio ( Lithium-Ion Battery ) Min. Charging Life Min 900 Charging ( Battery Life Of 4 To 5 Years ) Battery Working Range 8 To 10 Hours ( Room Temperature ) Charging Time 100% 5 Hours2. Remote Controller: A ) Manage Up To 4 Shuttles. Remote Control Radio Frequency Power Supply Rechargeable Battery Protection Ip65 Temperature Range-25°C To -1°C Working Range Up To 60Meter Stand By Function Standby Mode Active After 3 Min Of Not Use. B ) Shuttle Should Be Able To Count The Pallets In Single Or Multiple Racks . The Overall Number Of The Pallets On The Rack Or In The Warehouse Is Shown On The Display Of The Transmitter. , Supply, Installation, Testing And Commissioning Of Reach Truck 10000 Mm. Lifting Height As Per Specification:- A ) Capacity: 1600 Kg Or 1.60 Tons B ) Load Centre: 600 Mm C ) Lift Speed: 0.40 Ms / 0.50Ms Approx D ) Fork Length: 1200 E ) Battery Carrier: To Be Provided F ) Control Type: Control With Ac Induction Motor G ) Lift Height – 10000 Mm Minimum, Meximum Mast Height 4500 Mm. H ) Additional Battery And Charger To Be Provided Along With Each Reach Truck. I ) Lift Capacity At Maximum Load Height Of 10000 Mm Should Be Minimum 1000 Kg J ) Operating Termperature Within Cold Rooms Shall Be Minimum -25 Deg And Maximum 12 Deg C. ( Make: Godrej / Linde / Toyota / Jungheinrich ) , Supply, Installation, Testing And Commissioning Of Fork Lift With Fork Height 4500 Mm As Per Specification:- A ) Capacity: 2000 Kg Or 2.00 Tons Min. B ) Power Source: Battery C ) Lift Height – 4500 Mm Minimum D ) Control Type: Mosfet Control With Ac Induction Motor E ) Stationary Charger To Be Provided Along With Forklift And Additional Battery And Charger To Be Provided Along With Forklift. F ) Lift Capacity At Maximum Load Height Of 4500 Mm Should Be Minimum 1500 Kg ( Make: Godrej / Linde / Toyota / Jungheinrich ) , Supply, Installation, Testing And Commissioning Of Hand Pallet Truck With 2500 Kg Lifting Capacity As Per Specification:- A ) Load Capacity : 2500 Kg B ) Fork Length : 1100 Mm Min. C ) Fork Width : 150 Mm Min. D ) Out Side Fork Spread : 550 Mm Min. E ) Inside Fork Spread : 250 Mm Min. ( Make: Godrej / Mahindra Stiller / Lokpal / Maini ) , Supply, Installation, Testing And Commissioning Of Plastic Crates Of Outer Dimensions 540Mm X 360Mm X 290Mm ( 48 Ltr Capacity ) For Storage Of Around 20 Kg Fruits Vegetables ( Side Perforated Type ) Made Of Hdpe 100% Virgin Material As Per Specifications:- Dimension ( Outer ) 540Mmx360mmx290mm ( + / - 2% Size Variation ) B ) Load Capacity 20 Kgs C ) Design Side Perforated D ) Material Of Construction Hdpe 100% Virgin Material E ) Minimum Weight 1.5 Kg Or Above , Supply, Installation, Testing And Commissioning Of Plastic Pallets Of Outer Dimensions 1200Mm X1000mm X 150Mm For Dynamic Load 1200Kg And Static Load 4000Kg, Made Of Hdpe 100% Virgin Material With 04 Steel Bones With Reusable Pallet Strap - : 4No’S, Pallet Dimension ( Outer ) 12000Mmx1000mmx150mm A ) Dynamic Load 1200Kg B ) Perforated C ) Material Of Construction Hdpe 100% Virgin Material D ) Pallet Strap Specifications ( 4 Nos With Each Pallet ) : Velcro Type / Pp Straps, Weight Bearing Capacity Of 500Kgs , 1.3 Wiring For Light Point / Fan Point / Exhaust Fan Point / Call Bell Point With 1.5 Sq.Mm Frls Pvc Insulated Copper Conductor Single Core Cable In Surface / Recessed Steel Conduit, With Modular Switch, Modular Plate, Suitable Gi Box And Earthing The Point With 1.5 Sq.Mm.Frls Pvc Insulated Copper Conductor Single Core Cable Etc As Required. For Cold Room, Ripening Room, Loading Unloading, Galleries, Ante Chambers 1.3.3 Group C , 1.5 Wiring For Light / Power Plug With 2X4 Sq. Mm Frls Pvc Insulated Copper Conductor Single Core Cable In Surface / Recessed Medium Class Steel Conduit Alongwith 1 Nos 4 Sq. Mm Frls Pvc Insulated Copper Conductor Single Core Cable Cable For Loop Earthing As Required. , 1.7 Wiring For Circuit / Submain Wiring Along With Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface / Recessed Steel Conduit As Required1.7.3 2 X 4 Sq.Mm +1 X 4 Sq.Mm Earth Wire , 1.24 Supplying And Fixingfollowing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required1.24.1 5 / 6 Amps Switch , 1.24 Supplying And Fixingfollowing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required1.24.3 15 / 16 Amps Switch , 1.24 Supplying And Fixingfollowing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required1.24.4 3 Pin 5 / 6 Amps Socket Out Let , 1.24 Supplying And Fixingfollowing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required1.24.5 6 Pin 15 / 16 Amps Socket Outlet , 1.24 Supplying And Fixingfollowing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required1.24.6 Telephone Socket Outlet , 1.25 Supplying And Fixing Stepped Type Electronic Fan Regulator On The Existing Modular Plate Switch Box Including Connections But Excluding Modular Plate Etc. As Required. , 1.27 Supplying And Fixing Following Size / Modules, Gi Box Along With Modular Base & Cover Plate & For Modular Switches In Recess Etc As Required. 1.27.1 1 Or 2 Module ( 75Mmx75mm ) , 1.27 Supplying And Fixing Following Size / Modules, Gi Box Along With Modular Base & Cover Plate & For Modular Switches In Recess Etc As Required. 1.27.2 3 Module ( 100Mmx75mm ) , 1.27 Supplying And Fixing Following Size / Modules, Gi Box Along With Modular Base & Cover Plate & For Modular Switches In Recess Etc As Required. 1.27.4 6 Module ( 200Mmx75mm ) , 1.27 Supplying And Fixing Following Size / Modules, Gi Box Along With Modular Base & Cover Plate & For Modular Switches In Recess Etc As Required. 1.27.5 8 Module ( 125Mmx125mm ) , 1.41 Installation, Testing And Commissioning Of Pre-Wired Fluorescent Fitting / Compact Fluorescent Fitting Of All Types, Complete With All Accessories And Tube Etc. On Wall / Cieling And Connection With 1.5 Sq.Mm Frls Pvc Insulated, Copper Conductor, Single Core Cable And Earthing Etc. As Required. , 1.44 Installation, Testing And Commissioning Of Ceiling Fan, Including Wiring The Down Rod Of Standard Length ( Upto 30 Cm ) With 1.5 Sq Mm Frls Pvc Insulated, Copper Conductor, Single Core Cable Etc. As Required. , 1.50.1 Installation Of Exhaust Fan Upto 450 Mm Sweep In The Existing Opening, Including Making The Hole To Suit The Size Of The Above Fan, Making Good The Damage, Connection, Testing, Commissioning Etc As Required. , 1.51 Extra For Fixing The Louvers / Shutters Complete With Frlsame For A Exhaust Fan Of All Sizes. , 2.5 Supplying And Fixing Following Ways, Surface / Recess Mounting, Vertical Type, 415 Volts, Tpn Mcb Distribution Board Of Sheet Steel, Dust Protected, Duly Powder Painted Inclusive Of 200 Amps Tinned Copper Bus Bar, Common Nutral Link, Earth Bar, Din Bar For Mounting Mcbs ( But Without Mcbs And Incomer ) As Required.2.5.2 8 Way ( 4 + 24 ) , Double Door , 2.5 Supplying And Fixing Following Ways, Surface / Recess Mounting, Vertical Type, 415 Volts, Tpn Mcb Distribution Board Of Sheet Steel, Dust Protected, Duly Powder Painted Inclusive Of 200 Amps Tinned Copper Bus Bar, Common Nutral Link, Earth Bar, Din Bar For Mounting Mcbs ( But Without Mcbs And Incomer ) As Required.2.5.3 12 Way ( 4 + 36 ) , Double Door , 2.10 Supplying And Fixing 5 Amps To 32 Amps Rating, 240 / 415 Volts, C Curve, Miniature Circuit Breaker Suitable For Lighting And Other Loads Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc.As Required. 2.10.1 Single Pole , 2.10 Supplying And Fixing32 Amps Rating, 240 / 415 Volts, C Curve, Miniature Circuit Breaker Suitable For Lighting And Other Loads Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc.As Required. 2.10.4 Triple Pole 32 Amps , Supplying And Fixing Of 20 Amps, 240 Volts, Spn Industrial Type Socket Outlet With 2 Pole And Earth, Metal Enclosed Plug Top Along With 20 Amps C Curve Sp Mcb In Sheet Steel Enclosure On Surface Or Recessed With Chained Metal Cover For The Socket Outlet And Complete With Connections, Testing And Commissioning Etc. As Required. ( For Dock Leveller, Shuttle Chargers, Doors ) , Supplying And Fixing Of 30 Amps, 415 Volts, Tpn Industrial Type Socket Outlet With 2 Pole And Earth, Metal Enclosed Plug Top Along With 20 Amps C Curve Tp Mcb In Sheet Steel Enclosure On Surface Or Recessed With Chained Metal Cover For The Socket Outlet And Complete With Connections, Testing And Commissioning Etc. As Required. For Fork Lift Charger. , 4.1 Supplying And Installing Following Size Of Perforated Pre-Painted M.S. Cable Trays With Perforation Not More Than 17.5%, In Convenient Sections, Joined With Connectors, Suspended Frlsom The Ceiling With M.S. Suspenders Including Bolts & Nuts, Painting Suspenders Etc As Required. 4.1.2 150 Mm Width X 50 Mm Depth X 2.0 Mm Thickness , 4.1.7 300 Mm Width X 50 Mm Depth X 2.0 Mm Thickness , 4.1.7 600 Mm Width X 50 Mm Depth X 2.0 Mm Thickness , 5.2 Earthing With Gi Pipe 4.5 Meter Long , 40 Mm Diaincluding Accesoried , And Providingmasonary Enclosurewith Cover Platehaving Locking Arrangement And Wateringpipe Of 2.7M Long Etc. With Charcoal / Coke And Salt As Required. For Lightning Arrestors. , 5.4 Earthing With Gi Earth Plate 600Mm X 600Mm X 6Mm Thick Including Accesories, And Providingmasonary Enclosurewith Cover Platehaving Locking Arrangement And Wateringpipe Etc. With Charcoal / Coke And Salt As Required. , 5.18 Providing And Fixing 6 Swg Dia G.I. Wire On Surface Or In Recess For Loop Earthing Along With Existing Surface / Recessed Conduit / Submain Wiring / Cable As Required. , 6.2 Providing And Fixing Of Lightning Conductor Finial, Made Of 25 Mm Dia 300Mm Long, G.I. Tube, Having Single Prong At Top, With 85Mm Dia 6Mm Thick G.I. Base Plate Including Holes Etc. Complete As Required. , 6.7 Providing And Fixing G.I. Tape 20 Mm X 3 Mm Thick On Parapet Or Surface Of Wall For Lightning Conductor Complete As Required. ( For Horizontal Run ) , 6.8 Providing And Fixing G.I. Tape 20 Mm X 3 Mm Thick On Parapet Or Surface Of Wall For Lightning Conductor Complete As Required. ( For Vertical Run ) , 6.12 Providing And Fixing Testing Joint, Made Of 20 Mm X 3 Mm Thick G.I. Strip, 125 Mm Long, With 4 Nos. Of G.I. Bolts, Nuts, Chuck Nuts And Spring Washers Etc. Complete As Required. , 6.14 Providing And Laying G.I. Tape 32 Mm X 6 Mm From Earth Electrode Directly In Ground As Required. , 7.5 Laying Of One Number Pvc Insulated Pvc Sheathed / Xlpe Power Cable If 1.1Kv Grade Of The Following Size In Existing Rcc / Hume / Metal Pipe In Ground. 7.5.1 Upto 35 Sq Mm , 7.5 Laying Of One Number Pvc Insulated Pvc Sheathed / Xlpe Power Cable If 1.1Kv Grade Of The Following Size In Existing Rcc / Hume / Metal Pipe In Ground. 7.5.4 Above 185 Sq.Mm. Upto 400Sq. Mm , 7.8 Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Cable Tray As Required. 7.8.1 Upto 35 Sq.Mm ( Clamped With 1Mm Thick Saddle ) , 7.8 Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Cable Tray As Required. 7.8.4 Above 185 Sq.Mm And Upto 400 Sq.Mm ( Clamped With 40X3mm Ms Flat Clamp ) , 9.1 Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For The Following Sizes Of Pvc Insulated Pvc Sheathed / Xlpe Aluminium Conductor Cableof 1.1Kv Grade As Required 9.1.32 4X10 / 6 Sq. Mm , 9.1 Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For The Following Sizes Of Pvc Insulated Pvc Sheathed / Xlpe Aluminium Conductor Cableof 1.1Kv Grade As Required 9.1.25 4X25 Sq.Mm , 9.1 Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For The Following Sizes Of Pvc Insulated Pvc Sheathed / Xlpe Aluminium Conductor Cableof 1.1Kv Grade As Required 9.1.27 3.5 X 240 Sq. Mm , 14.14 Providing, Laying, And Fixing Following Dia Rcc Pipe Np2 Class ( Light Duty ) In Ground Complete With Rcc Collars, Jointing With Cement Mortor 1:2 ( 1 Cement, 2 Fine Sand ) Including Trenching ( 75Cm Deep ) And Refilling As Required. 14.14.4 300 Mm Dia , 19.1 1200Mm Sweep, Bldc Ceiling Fan With All Mountings , 13.1 Supply & Erection Of Galvanised Stay Set For 11Kv Overhead Linecomplete With 19 / 20 Mm Dia X 1.8 Mtr Long Stay Rod, Anchor Plate Of Size 45Cmx45cmx7.5 Mm Thick, Thimble, Stay Clamps With Turn Buckle ( 20Mm X 600Mm ) 7 / 4.0 Mm Diagi Stay Wire And 11Kv Strain Insulator Etc In Cement Concrete 1:3:6 ( 1 Cement: 3 Course Sand: 6 Graded Stone Aggregate 40Mm Nominal Size ) Foundation Including Excavation & Refilling Etc As Required. , 13.4 Supplying Of Channel Iron 75X40x6mm ( 7.14Kg / Mtr ) Cross Arm For Two Overhead Line Conductor Complete With 50X50x6mm Angle Iron Bracket Welded To The Channel Iron Complete Withb 50X6 Mm Ms Flat Iron Clamps , Bolts, Nuts, Including Drilling Of Holes For Insulator, Painting With Primer And Finish Paint As Required , 13.1O Supply And Erection Of 11Kv Pin Insulators Complete With Large Steel Head, Gi Pin, Nuts, Washers Etc As Required , 13.11 Supplying & Erection Of 11Kv Disc Insulatorsfor 11Kv Overhead Line With Galvanised Insulator Fitting Ball & Socket Type Complete With Galvanised Strain Clamps, Nut, Bolts, Washers Etc As Required , 13.13 Supply & Erection Of Three Piece Non Linear Resistor Type Ligfhtning Arrestor Suitable For 3Vwire 11Kv Overhead Linewith Rated Voltage Of 9Kv ( Rms ) With A Nominal Discharge Currentrating 5Ka Complete Withbgalvanised Clampning Arrangement , Gi Bolt Nuts , Washersetc As Required , 17.1.11 Supply , Installation Testing, Commissioning Of Main Control And Indicating Panel Made Out Of 16 Swg Sheet To Accommodate The Following Items, Duly Powder Coated In Approved Color With Louvers For Ventilation, Locking Arrangement, Audio / Visual Indication For Fire Alarm And Pa System, Monitoring System System Including Connection, Interconnection Etc Complete As Required.:- 6 Zone Panel For Fire Alarm System. 100 W Amplifier Racks Suitable For Operation On 230V Ac / 24V Dc Supply Conforming To Iec 268-3 Complete With All Accessories As Required. 2 Nos, Talk Back Master Station With Led Push To Talk Push Button For Operation On 230V Ac / 24Vdc Supply Conforming To Iec 268 For Simplex Mode Of Operation / Communication Suitable For 20 Nos Talk Back Unit - 1 Set, Amplifier Change Over Switch For Interchanging Amplifer -1 No, Montor Panel For Loud Speaker Complete Output Selector On / Off Switch, Fuse Visual Indications Etc Complete As Required. - 1 No, Gooseneck Microphone With Stand And On / Off Switch - 1 No, Mains On / Off Switch, Fuse Indcating Lamps, Dc & Ac Voltmeter And Ammeter, Terminal Blocks Etc Complete As Required. - 1 Set, Battery Charger Trickle Cum Boost To Take Complete Load Of Fire Alarm And Pa System Complete With All Accessories Including Providing And Fixng 2 Nos 12V 30Ah Each Sealed Maintenance Free Batteries - 1 Set , 17.1.2 Supply, Installation, Testing & Commisioning Ofsmoke Detector With Builtin Ledand Mounting Base Complete With All Connection As Required , 17.1.7 Supply, Installation, Testing & Commisioning Of Fire Alarm Sounder With Facility To Make Announcement Mounted In Abs Box With Hinged Cover Plate And Suitable For Operation With Amplifier I / C Line Matching Transformer Etc Complete As Required. , 17.1.4 Supply, Installation, Testing & Commisioning Of Manual Call Box Of Abs Type In Surface / Recessed With Stainless Steel Chain And Hammer Assembly Complete With Glass, Push Button Etc As Required. , 17.1.1 Supply, Installation, Testing & Commisioning Of Heat Detector Operating At 54°C / 57°C With Rate Of Rise Cum Fixed Temperature ( Dual Thermister ) Type With Mounting Base Complete With All Connections Etc As Required. , 17.1.5 Supply, Installation, Testing & Commisioning Of Response Indicator On Recess / Surface Ms Box Having Two Leds Metallic Cover Complete With All Connectionsetc As Required , Item 10 Jpdcl Sor Supply, Installation, Testing, Commissioning Of 8Mtr Steel Tubular Pole ( St-410Sp15 ) , S.No 181Sor Jpdcl, Jammu Transformer Input: 11Kv+ / - 5% In Steps Of 2½ %, 3 Phase, 50Hz, Dyn11, Onan, Outdoor, Oil Cooled, Temperature Rise: 50 / 55°C. Outdoor Bare Bushing.Output 433V, 3 Ph, 50 Hz, + Neutral.Ltcable End Boxsuitablefor 2Nos 3½X 240 Mm² Lt Cables In Outgoing. All Mounted Accessories Shall Be There As Per Latest Is Specifications. Capacity 400Kva , S.No 92 Sor, Ajpdcl Jammu A2xfy 3.5C X 240 Sq. Mm , Common Miscellaneous Equipments, S.No 02 Sor, Ajpdcl Jammu Fire Extinguisher Co2 Type Of 4.5 Kg Capacity For Control Room , Common Miscellaneous Equipments, S.No 03 Sor, Jpdcl Jammu 3 Sand Bucket Fire Extinguisher , Supply, Installation, Testing & Commissioning Of Indoor Type Free Standing Main Lt Panel Suitable For 415A, 3P + N +E, 50Hz, 50Ka, Including 150 Kvar Capacitor Section With Following Switch Gears:- Design As Per Sld, Incomers: 2 Nos 630A Mccb As Per Sld. 2 Nos 630 A C / O Switch, Outgoings:3 No 250A Mccb, 1No 2000A Mccb, 6 No 63A Mccb , 9 Nos 63A Tpn Mcb , With 1 Sets Of 6#25Kvar+ Pf Relay 10 Channels, Cts In Incomer. Busbars 800A, 3Ph 4W, 50Hz, Aluminium. Meteringas Per Sld , Supply Of Prewired Box Type Led Luminaires, Ceiling / Surface Mounted With All Accessories As Per Standard Items, Connection With 1.5 Sq. Mm. Pvc Insulated Wire Complete As Required And As Per Approved Makes. :- Simillar To Cgl Cat. No Cis300-40-57--Sl-Dp-Ngr 40W, Ip65 Protection Or Equivalent , Supply Of Prewired Box Type Led Luminaires, Ceiling / Surface Mounted With All Accessories As Per Standard Items, Connection With 1.5 Sq. Mm. Pvc Insulated Wire Complete As Required And As Per Approved Makes. :- Simillar To Cgl Cat. No. Lcnp-80-Cdl60mled Ip66 Or Equivalent. For Cold Rooms , Supply Of Prewired Box Type Led Luminaires, Ceiling / Surface Mounted With All Accessories As Per Standard Items, Connection With 1.5 Sq. Mm. Pvc Insulated Wire Complete As Required And As Per Approved Makes. :- Similar To Cgl Cat No Lsts-30-Cdl-M, Ip 66 Led Streetlights, Or Equivalent , Supply Of 12" ( 305Mm ) Dia ( 900 Rpm ) Single Phase Exhaust Fan With Louvres Complete As Required. , Supply Of Following Sizes Alluminium Conductor, Xlpe Insulated, Armoured, Pvc Sheathed Cable 1100 V Grade Complete As Required:- A2xfy 4C X 25 Sq. Mm , Supply Of Following Sizes Alluminium Conductor, Xlpe Insulated, Armoured, Pvc Sheathed Cable 1100 V Grade Complete As Required:- A2xfy 4X10 Sq. Mm , Supply Of Following Sizes Copper Conductor, Xlpe Insulated, Armoured, Pvc Sheathed Cable 1100 V Grade Complete As Required. For Stret Light:- A2xfy 3C X 6 Sq. Mm , Diesel Generator Set:- Supply, Installation, Testing & Commissioning Of Diesel Generating Set Of 400Kva Rating Silent Type Radiator Type, Suitable For Of 415V, 3 Phase 4 Wire, 0.8 Pf. ( Lagging ) 50C / S A.C Supply Complete With Engine ( 1500 Rpm ) And Alternator Dg Set Controller With Accessories Including Residential Type Silencer And Manual Control Panel Fuel Service Tank As Per Standard, Battery And Battery Charger With All Associated Accessories Including Mccb Of Suitable Rating & Standard Set Of Tools And Anti-Vibration Mounting Pads Etc. The Specification Shall Be As Per Cpcb Iv Specification Attached. The Instalation, Testing, Commissioning Shall Be Done As Per Cpcb Iv. , Voltage Stabiliser:- Supply, Installation, Testing, Commissioning Of Servo Motor Operated Automatic Line Voltage Correctors Copper Bound Indoor Type, Continuous Duty, Conforming To Is9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) Suitable For Phase Voltage Of 120-280V. 3 Phase Line Voltage Corrector Shall Comprise Of 3 Single Phase Line Voltage Correctors Conforming To Is 9815 ( Part 1 ) / 1994 ( Reaffirmed 2009 ) , Connected In Star And Enclosed In A Single Enclosure With Common Control Panel And Shall Be Suitable For Unbalanced Input Voltage. Rate Output Voltage Shall Be 240V For Single Phase Lvc And 415V For 3 Phase Lvc Respectively. Rating 3 X 150 Kva3 Phase, 3Ph, 50 Hz. , Supplying And Layng Of 3X1.5 Mm² Fire Survival Armoured Cable, 600V / 1000V Rated With Annealed Copper Conductor Having Xlpe Insulated Steel Wire Armoured And Frls Outer Sheath Complete As Required.
|