Tenders Are Invited For Detail Technical Specification Of Solid Control Equipment For Ips Cardwell Rig Rehabilitation/Upgradation 1.0 Shale Shaker: 03 Sets A) Shale Shaker System Should Consist Of 3 (Three) Linear Motion Shale Shakers Of Derrick Flc 2000-3/Flc-503/Hyperpool 4 Panel Low Weir, Usa(To Be Installed On Shaker Tank To Remove Cuttings Of Drilling Fluid) G Force:6 Or Above. Deck Adjusting Range: Downhill -10 Or Above, Uphill + 60 Or Above Deck Adjusting System: Adjust While Drilling Without Suspending Operation To Achieve Optimum Deck Angle Adjustment For Different Flow Rate. Weir Height: Low Profile Shaker, Maximum Weir Height 30?? Or Below. No. Screen Panels: 3 (Three)/4(Four) Panels Of Plain Or Pyramid Screens. Drive Motor : Two For Each Shaker. Each Motor: 2.5 Hp Or Above, 380-400V, 3 Phase, 50Hz., 1450 Rpm Explosion Proof, Ip-66 Flow Capacity: Each Shaker 500 Gpm Or More. Inlet Connection: 10??(Inch). B)Mandatory Spares For Above Shale Shaker Which Must Include But Not Limited To The Followings: I) Screen , Mesh Size-38/40------------24 Pcs Ii) Screen , Mesh Size-60----------------32 Pcs Iii) Screen , Mesh Size-80----------------32 Pcs Iv) Screen , Mesh Size-110---------------16 Pcs V) Screen , Mesh Size-140---------------16 Pcs Vi) Screen , Mesh Size-200/210----------16 Pcs. C)There Should Be A Common Mud Box For Distributing Mud From 12 Mud Flow Line To 03 Shale Shakers Through 10 Butterfly Valves. This Box Should Also Have Two Distribution Lines For Mud/Gas Separator And Others With 10Butterfly Valves. 2.0 De-Sander: 01 Set 01 (One) De Sander Set Dsv-10-3 Derrick, Usa, Complete Package With 3 Nos. 10 Inch Or Above Diameter Hydrocyclones, 1500 Gpm Or Above Capacity, Mounted On Easy Move Skid, (To Be Installed On Tank) Mandatory Spares For Above De-Sander Which Must Include But Not Limited To The Followings: 1. Apex- -06 Pcs 3.0 De-Silter: 01 Set 01 (One) Desilter Set Model: Derrick S-416-S, Usa, Complete Package With Minimum 16 (Sixteen) 4(Four) Inch Diameter Hydrocyclones, 1280 Gpm Or Above Capacity, Mounted On Easy Move Skid (To Be Installed On Tank) Mandatory Spares For Above De-Silter Which Must Include But Not Limited To The Followings: A) Apex For Cones--------10 Pcs 4.0 Mud Cleaner: 01 Set A) 01 (One) Complete Mud Cleaner Set Model: Derrick Flc 503/Hyperpool 4 Panel, Usa, Complete Package With 16 (Sixteen) Or More 4(Four) Inch Diameter Hydrocyclones, 1500 Gpm Or Above Capacity, Mounted On Easy Move Skid, (To Be Installed On Tank) B) Mandatory Spares Which Must Include But Not Limited To The Followings: I) Screen , Mesh Size-100----------------16 Pcs Ii) Screen , Mesh Size-140/150----------16 Pcs Iii) Screen , Mesh Size-210----------------16 Pcs Iv) Screen , Mesh Size-250----------------08 Pcs V) Apex For Cones--------------------------10 Pcs 5.0 Vacuum Degasser: 01 Set A) One Set Horizontal Vacuum De-Gasser Complete Set Model: Derrick Vacu-Flo1200, Usa Of 63 ? Or More Diameter Vacuum Chamber Mounted On Oilfield Skid Complete With Vacuum Pump Powered By 5Hp Or Above 3 Phase 380-400V, 50Hz Explosion Proof Electric Motor, Liquid Trap, Air Filter, Three-Way Valve And Separately Installed Educator Assembly (Mud Discharge Line Jet With Erosion Resistant Tungsten Carbide Nozzle). Vacuum Degasser Should Be Installed On The Tank. B) Mandatory Spares Which Must Include But Not Limited To The Followings: V Belt----01Set 6.0 Shale Shaker Tank: 01 Set One Set Shale Shaker Tank. Overall Skid Length Should Be 40 Ft. Height (9Ft With Skid) And Width (9.5Ft). Inner Length Will Be 36 Ft And Should Include But Not Limited To The Following: B) Mounting For Three Linear Motion Shale Shakers (Derrick Flc2000-3/Flc-503/Hyperpool 4 Panel Low Weir/Equivalent, Usa), Hinged Cuttings Side Walkway On Three Sides Of Shaker. C) Should Have 03 (Three) Compartments One Is Small And Other Two Are Equal.De-Sander &De-Gasser Compartment. D) Decanting Compartment Situated Below The Shakers With Sloped Bottom (It Is Like Trapezoid Shape With Bottom Dimension Reduced, Approximate Volume 8M3). Should Have One Cleaning Gate. Flow Line To D-Gasser, De Sander And D-Silter Compartment With Gate From The Decanting Compartment. E) Mounting, Suction And Delivery Lines With Required Valves, Rubber Compensator& Fittings For De-Sander Model: Dsv-10-3 Derrick, Usa. F) Mounting, Suction And Delivery Lines With Required Valves, Rubber Compensator& Fittings For Degasser Model: Derrick Vacu-Flo1200, Usa. G) For De-Sander And Degasser 02 (Two) Sets Of Xbsy 6X8 12 ½ Centrifugal Pumps Coupled With 55Kw, 3 Phase, 380-400V, 50Hz Explosion Proof Ac Electric Motors Should Be Installed On The Same Skid. H) 12?? × 18?? Mud Ditch With Dump Gate To Each Compartment And Isolation Gates. I) Provision For One Stair (2Ft Width) To Ground In The Existing Position. J) One (1) 1?? Wash Down Line With Valve And 30 Ft. Water Hose Fitted With Adjustable Nozzle. K) Three (3) Pcs Of Clean Out Gates (One Each For Each Compartment). L) Two (2) Pcs 3?? Bottom Mud Guns With Valve And Swinging System (One Each In Each Desander And Degasser Compartment Compartments) M) Bottom Equalizer Line (Minimum 12 Inch) Connected With Intermediate Tank Fitted With Butterfly Valve And Dresser Sleeve Or By Any Upgraded Technique. N) Mud Gun Line To Shaker Tank. O) Water Line Connection To Shaker Tank. P) Desander And Degasser Compartments Should Be Connected By Butterfly Valves And Would Be Operated From The Top Of Tank. Q) Suitable Ladders Are Required To Be Supplied. R) Shale Shaker Tank Will Get Power Directly From Mcc House. Also De-Sander And De-Gasser Will Get Power And Control Directly From Mcc House. There Is No Connection Or Junction In Between Them. S) Approximate Power Cable Length 60 Meter For Each Of De-Sander And De-Gasser. T) Approximate Control Cable Length 2×60 Meter For Each Pump. U) Approximate Power Cable Length 60 Meter For Tank Power. Both Ends Have Plug. Plug Cat No.: Ap20034e, Appleton. V) Approximate Power Cable Length 60 Meter For Lighting Power. Both Ends Have Plug. Plug Cat No.: Acp3023bc, Appleton. W) Two Push Buttons Located On The Shale Shaker Tank. Both Come From Mcc House. Push Button Part No.: Ghg4118201r1308, Ceag, Eaton. Each Push Button Should Be Installed With Proper Cable Glands, Plugs, Receptacles, Mounting Clamps And Fittings. X) Adequate Rated Cable Should Be Used. All Cable Must Be H07rn-F Type. Y) One Explosion Proof, Ip66 Standard Distribution Enclosure Must Be Installed On The Shale Shaker Tank. Two Incoming Receptacle Will Be Installed On Distribution Enclosure End. Receptacles Cat No.: Adja20034-200 And Adre3023-100. Z) 04 (Four) Outgoing Receptacle Will Be Installed For Four Agitator. Receptacles Cat No.: Adre3034-100, Appleton. Aa) 10 (Ten) Outgoing Receptacle Will Be Installed For Nine Lighting Fixtures. Receptacles Cat No.: Efsc 17520232, Appleton. Bb) 04 (Four) Suitable Plug &Receptacle For Three Shale Shaker And One Vacuum Degasser Will Be Used. All Plug/Receptacle Must Be From Appleton/Cruse-Hinds. Cc) Power Cable Plug On Mcc End Will Be Ap20034e, Appleton For Each Of De-Sander And De-Gasser. Dd) Control Cable Plug On Mcc End Will Be A12-Sp-416-M-08B-01, Ccs For Each Of De-Sander And De-Gasser. Ee) Lighting Cable Plug On Both Light End And Shale Shaker Tank End Will Be Ecp-20232, Appleton. Ff) One Number Of Explosion Proof Heavy Duty Lighting Fixtures Is To Be Installed Near De-Sander And De-Gasser Pump. Gg) One Number Of Explosion Proof Heavy Duty Lighting Fixtures Is To Be Installed On Shale Shaker Tank Side. Hh) Three Number Of Explosion Proof Heavy Duty Lighting Fixtures Is To Be Installed In Removable Pole On The Top Of Three Shale Shaker. One Receptacle Will Be Installed On Each Pole. Receptacle Cat No.: Efsc 17520232, Appleton. Ii) Lighting Fixtures Should Be Installed With Proper Cable Glands, Safety Chain, Plugs, Receptacles, Mounting Clamps And Fittings. Jj) Lighting Fixtures Model: Mar2 07-L2-4-B-50, Rig-A-Lite, Azz Inc. 7.0 Intermediate Tank: 1 Set One Set Intermediate Tank. Width (9.5Ft) × Height (9Ft With Skid) × Length (36Ft Inner Dimensions) And Skid Length Should Be 40 Ft, Should Have 03 (Three) Equal Compartments And Should Include But Not Limited To The Following: A) De-Silter Compartment. B) Mounting, Suction & Delivery Lines With Required Valves, Rubber Compensator& Fittings For De-Silter Model: Derrick S-416-S, Usa. C) Mud Cleaner Compartment. D) Mounting, Suction & Delivery Lines With Required Valves, Rubber Compensator& Fittings For Mud Cleaner Model: Derrick Flc 503/Hyperpool 4 Panel, Usa. E) For De-Silter And Mud Cleaner 02 (Two) Sets Of Xbsy 6X8 12 ½ Centrifugal Pumps Coupled With 55Kw, 3 Phase, 380-400V, 50Hz Explosion Proof Ac Electric Motors Should Be Installed On The Same Skid. F) 03 (Three) Mud Agitator Sets In Three Compartments. Each Agitator Should Be Equipped With 04 (Four) Tank Baffle. Mud Agitators Should Be Of Api Standard, Heavy Duty& From Any Renowned Company Suitable, 8 Ft. High (Inside) And 9.5 Ft Width Mud Tanks And Installed On The Mud Tanks As Described In Mud Tank Sections. Mud Agitators Should Be Of Continuous Duty Type For Weighted Mud With High Torque Right Angle Oil Cooled Gear Box With Horizontal 11Kw, 380-400V, 50Hz Continuous Duty Explosion Proof Ac Electric Motor. Agitator Model & Make: Nj15, China. Agitator Should Have One Local 3Ph Dol Motor Starter Panel. 3Ph Dol Motor Starter Model: Msb110d42s, Appleton. G) 12?? × 18?? Mud Ditch With Dump Gate To Each Compartment And Isolation Gates. H) One (1) 1?? Wash Down Line With Valve And 30 Ft. Water Hose Fitted With Adjustable Nozzle At The Mud CleanerS End. I) Three (3) Pcs Of Clean Out Gates (One Each For Each Compartment). J) Three (3) Pcs 3?? Bottom Mud Guns With Valve And Swinging System ( One Each In Each Compartment) K) Bottom Equalizer Line (Minimum 12 Inch) With Suction Tank Fitted With Butterfly Valve And Dresser Sleeve
|