1. The Subject Of The Order Is The Performance Of Construction Works Related To The Adaptation Of The Building Of The Main Building Museum - Museum Of The Kujawy And Dobrzyń Land In Włocławek, At Ul. Słowackiego 1A, For Compliance With Fire Regulations. Facility Category: Ix Investment Address: 87-800 Włocławek, Ul. Słowackiego 1Aregistration Unit City Of Włocławek; Registration Area 046401_1.0450.11; , Włocławek Km45 Plot No. 11 And 9/7 Investor: Museum Of The Kujawy And Dobrzyń Land In Włocławek, Ul. Słowackiego 1A, 87-800 Włocławekarea, Height And Number Of Floors: Three-Story Building (An Additional Fourth Floor Between The Floors), Partially With A Basement. Building Area: 378.29 M2 Usable Area: 1225.73 M2 Including: - Basement 155.99 M2 - Ground Floor 205.24 M2 M2 - 1St Floor 263.18 M2 - Interfloor (1St, 2Nd) 33.46 M2 - 2Nd Floor 272.57 M2 - Unused Attic 298.10 M2 Cubic Capacity 4972.73 M3 Building Height 14 M - Medium-High Building The Subject Of The Order Is Described In The Design Documentation Constituting Annex No. 9 To The Swz, Where The Scope Specified In Referred To In The Points: - Pab Points: 6.1, 6.3 - Partially Steel Doors For The Hydrophore Plant, 6.6, 6.7, 7.10, 7.11.B), 7.11.C); - Pt Points - Y: 6.1, 6.3 - Partially Steel Doors For The Hydrophore Plant, 6.6, 6.7, 7.10, 7.11.B), 7.11.C);- Pt Instal. Sanitary - Entire Scope;- Water Supply Connection - Entire Scope: Pzt, Pab, Pt, Annexes;- Pt - Electrical Industry: 1.3.4., 7, 8. The Subject Of The Order Is Only The First Stage Of The Task Described In The Entire Attached Complete Documentation. The Subject Of The Order Includes In Particular: 1) Separation Of A Hydrophore Room In The Basement, The Scope Of Which Includes:• Foundations• Installation Of A Hydrophore Set To Power The Installation Fire And Domestic • Building Walls In Rei120 Class • Laying Renovation Plasters • Painting Walls And Ceilings In Designated Rooms • Flooring • Installing Ei 60 Steel Doors • Ventilation • Marking Of Protruding Thresholds2) Hydrant Installation • Installation Of Internal Dn25 Hydrants With A Semi-Rigid Hose On Each Floor Of The Building • Filling Any Gaps In Internal Plasters, Grooves Left By Completed Installations Should Be Filled, Leveled And Painted3) Electrical Installation• Fire Protection Switch. • Power Supply For Fire Protection Devices. • Power Supply To Devices In The Hydrophore Room. The Existing Power Supply System Should Be Modernized In Accordance With The Attached Diagram In The Design. As Part Of The Task, The Contractor Will Install A Housing With A Certified Fire Protection Switch. 4) Construction Of A Water Supply Connection In Accordance With The Designs. The Designed Water Supply Connection For The Building Should Be Connected To The Existing Water Supply Network Ø110 In Mickiewicza Street Along The Route Of The Existing Connection, Which Should Be Eliminated By Dismantling The Connection Elements. The Water Supply Connection For The Building Was Designed With Pe100rc
Contact Information
Address
Muzeum Ziemi Kujawskiej I Dobrzyńskiej We Włocławku,Włocławek,87-800,Kujawsko-Pomorskie,Pl619 - Włocławski
Email
sekretariat@muzeum.wloclawek.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 115738385
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.