|
Temporary Facilities (Bulk House And Office), Project Billboard/Signboard, Occupational Safety And Health Program, Comfort & Hand Washing Facilities At Victorio National High School, Site Clearing Leveling And Layout, Structure Excavation (Common Soil), Embankment From Borrow, Structural Concrete (Class A.28 Days), Reinforcing Steel (Deformed), Formworks And Falsework, Plumbing Fixture, Cold Water Line, Sewer Line Works, 4.5Mm Fiber Cement Board On Metal Frame Ceiling, Doors, Aluminum Windows, Pre-Painted Metal Sheet (Rib Type,Long Span 0.5Mm Thk.), Glazed Tiles And Trims, Unglazed Tiles And Trims, Cement Plaster Finish, Painting Works (Ceilings), Painting Works (Masonry/Concrete), Painting Works (Ceilings), Painting Works (Steel), Structural Steel Trusses, Railing, Electrical Work, Common & Hand Washing Facilities At Talisay Integrated School, Site Clearing,Levelling And Layout, Structure Excavation (Common Soil), Embankment From Borrow, Structural Concrete (Class A,28Days), Reinforcing Steel (Deformed), Formworks An Falseworks, Plumbing Fixture, Cold Water Line, Sewer Line Works 5., 4.5Mm Fiber Cement Board On Metal Frame Ceiling, Doors, Aluminum Windows, Pre-Painted Metal Sheets (Rib Type,Long Span 0.5Mm Thk), Glazed Tiles And Trims, Unglazed Tiles And Trims, Cement Plaster Finish, Painting Works (Ceilings), Painting Works (Masonry/Concrete), Painting Works (Ceilings), Painting Works (Steel), Structural Steel Trusses, Railing, Electrical Works, Hauling Works (Poblacion Site-Talisay Waiting Shade (Use Pump Boat), Hauling Works (Talisay Waiting Shade-Project Site)
|