|
Supply Of Adaptor And Layout Special Parts Of Msb Pfcc(Pfcc Lpgtu Pru) Gds And Ff For Nrep Supply Of Adaptor And Layout Special Parts Of Msb Pfcc(Pfcc Lpgtu Pru) Gds And Ff For Nrep , Supply Ofspecial Partsfor Nrep Project Incuding Tpi Charges As Specified In Material Requisition. , Order-Designation Injection Quill Pressure Nominal600,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Nap-1P22-12017 / Oc-1P22-93010 Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0019Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042. , Order-Designation Injection Quill (Nace)Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Ohd-1P22-24003 / Oc-1P22-93004 Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0018Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Paddle Spacer Cs H2 Ser.Pressure Nominal150,0 Standardmfr. Stdconnectionfor Rf Flgs,B16.5 Descriptionsraised Face Dimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0022Materiala105n/A516 Gr.60N Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0006 And In-042 , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-773201Line No Hto-1P22-77955Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0003Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141f , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-773202Line No Hto-1P22-77955Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0004Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141f , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-663101Line No Cbd-1P22-66951Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0001Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141f , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-663102Line No Cbd-1P22-66951Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0002Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141f , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-703101Line No Sca-1P22-88957Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0005Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141cf , Order-Designation Special Part Level Transmitterpressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionslevel Transmitter For Stilling Well 1P22-Lt-703102Line No Sca-1P22-88957Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0006Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.Refer Ball Valve Datasheet Vkd141cf , Order-Designation Special Elbow (Nace)Pressure Nominal300,0 Standardtkis Drawingconnectionbw Ends,Sch 160 Descriptionsspecial Elbow For Fixinginjection Quill 1P22-Ip-2602For Line No.Pl-1P22-26005 Line No.Ohd-1P22-24003 /Oc-1P22-93004 Dimensions Acc. To Drawing, Doc.No. Tk-1P22a-Pi-Dtl-0027Materiala234 Gr Wpb-S Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0007 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0008 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0009 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0010 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0011 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0012 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0013 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0014 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0015 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0016 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawing, Doc.No.Tk-1P22a-Pi-Dtl-0017 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Nap-1P23-12001Bdimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0001Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012 , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Nap-1P23-12001Bdimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0002Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012 , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Nap-1P23-12001Bdimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0003Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012 , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No.Flg-1P23-63143Dimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0004Materiala312 Gr.Tp321 Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012 , Order-Designation Special Forged Part Pressure Nominal300,0 Standardtkis Drawingconnectionbw Ends,Sch 160 Descriptionsdimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0021Materiala182 Gr.F11 Cl.2Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042. , Order-Designation Drip Ring (Nace)Standardtkis Drawingconnectionpe, Sch160descriptionsforgeddimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0023Materiala182 Gr.F316add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Drip Ring (Nace)Standardtkis Drawingconnectionpe, Sch160descriptionsforgeddimensions Acc. To Drawing, Doc.No. Tk-1P23a-Pi-Dtl-0024Materiala182 Gr.F316add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0005 And Tk-1P23a-Pi-Dtl-0006Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0007 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0008 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0009 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0010 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0011 And Tk-1P23a-Pi-Dtl-0012Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0013 And Tk-1P23a-Pi-Dtl-0014Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0015 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0016 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0017 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0018 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0019 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Steam Ring, Cs (Ibr)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5, Rfdescriptionsdimensions Acc. To Drawingdoc.No.Tk-1P23a-Pi-Dtl-0020 Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0008Tk-1Zzza-Pi-Spe-0012 And In-0042. Ibr Certification Form Iiia/Iiic Required , Order-Designation Injection Quill Pressure Nominal600,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Rf-1P24-25011Dimensions Acc. To Drawing, Doc.No. Tk-1P24a-Pi-Dtl-0001Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042. , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Fcn-1P25-30139 Dimensions Acc. To Drawing, Doc.No. Tk-1P25a-Pi-Dtl-0002Materiala312 Gr.Tp316/316Ladd. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012Material Shall Be Dual Certified And Themaximum Carbon Content Shall Be 0.03% , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Rf-1P27-25001Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0014Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042. , Order-Designation Injection Quill (Nace)Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Rf-1P27-25008Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0015Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Injection Quill(Nace) Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Pv-1P27-37002Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0016Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Injection Quill (Nace)Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No.Ohd-1P27-24003Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0017Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Injection Quill (Nace)Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Pl-1P27-26054Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0018Materiala106 Gr.B Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012And In-0042.For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Rf-1P27-25030Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0019Materiala312 Gr.Tp321 Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012 , Order-Designation Injection Quill Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf Descriptionsinjection Quill For Line No. Ohd-1P27-24003 Dimensions Acc. To Drawing, Doc.No. Tk-1P27a-Pi-Dtl-0020Materiala312 Gr.Tp304/304Ladd. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0004, Tk-1Zzza-Pi-Spe-0005, Tk-1Zzza-Pi-Spe-0006, Tk-1Zzza-Pi-Spe-0012Material Shall Be Dual Certified And Themaximum Carbon Content Shall Be 0.03% , Supply Ofadaptors For Nrep Project Incuding Tpi Charges As Specified In Material Requisition. , Order-Designation Adaptor Flgd Ss Dualpressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5,Ff X Fnptdescriptionsforgedfacing : Flat Facedimensions Acc. To Drawing, Doc.No. Pin-Les-Pip-6265Materialbf/Cpl :A182 Gr.F304/304L Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012Material Shall Be Dual Certified And Themaximum Carbon Content Shall Be 0.03% , Order-Designation Adaptor Flgd Cs Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing : Raised Facematerialbf/Cpl :A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 And In-042 , Order-Designation Adaptor Flgd Cs (Nace)Pressure Nominal150,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing: Raised Face Service: Nace, Category 1 Materialbf/Cpl :A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 And In-042 For Sour(Nace) Service Req. Acc. To Nace Mr0103,Nr-0Zzzz-Pi-Spe-0025 And In-043 , Order-Designation Adaptor Flgd Cs Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing: Raised Face Materialbf/Cpl :A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 And In-042 , Order-Designation Adaptor Flgd Cs (H2 Ser.) Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing: Raised Face Materialbf/Cpl :A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 And In-042 , Order-Designation Adaptor Flgd As (H2 Ser.) Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing: Raised Face Materialbf/Cpl :A182 Gr.F5add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 , Order-Designation Adaptor Flgd As Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No.Pin-Les-Pip-6265 Facing: Raised Face Materialbf/Cpl :A182 Gr.F9add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012 , Order-Designation Adaptor Flgd Cs (Ibr) Pressure Nominal300,0 Standardtkis Drawingconnectionflgd,B16.5,Rf X Fnptdescriptionsforgeddimensions Acc. To Drawing, Doc.No. Pin-Les-Pip-6265Facing: Raised Face Materialbf/Cpl :A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0006Tk-1Zzza-Pi-Spe-0012And In-042Ibr Certificate In Form Iiic Required. , Order-Designation Adaptor Sw Cs Pressure Nominal3000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012And In-042 , Order-Designation Adaptor Sw Cs Pressure Nominal3000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012And In-042 , Order-Designation Adaptor Sw Cs Pressure Nominal9000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012And In-042 , Order-Designation Adaptor Sw Ltcs Pressure Nominal9000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A350 Gr.Lf2 Cl.1Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012And In-042 , Order-Designation Adaptor Sw Ss Dualpressure Nominal3000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A182 Gr.F304/304L Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012Material Shall Be Dual Certified And Themaximum Carbon Content Shall Be 0.03% , Order-Designation Adaptor Sw Ss Dualpressure Nominal3000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A182 Gr.F304/304L Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012Material Shall Be Dual Certified And Themaximum Carbon Content Shall Be 0.03% , Order-Designation Adaptor Sw Cs (Ibr) Pressure Nominal6000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Materialfitting:A105n Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012And In-042Ibr Certificate In Form Iiic Required. , Order-Designation Adaptor Sw As (Ibr) Pressure Nominal6000,0Standardtkis Drawingconnectionpe X Fnpt Descriptionsforgeddimensions Acc.To.Drawing,Doc.No. Pin-Les-Pip-6265Normalized & Tempered Materialfitting:A182 Gr.F11 Cl.2Add. Informationdocuments To Be Followed: Tk-1Zzza-Pi-Spe-0005Tk-1Zzza-Pi-Spe-0012Ibr Certificate In Form Iiic Required.
|