Quotation are invited for Cleaning of Marine Growth # One Intake Pipe at E Station E-Station Sea Water Intake Li 1032600779 1 ITEM-00001 1.0 SCOPE OF WORK CLEANING OF MARINE GROWTH # ONE INTAKE PIPE AT E STATION1.1 GENERALTHE WORK UNDER THIS CONTRACT INCLUDES CLEANING O F MARINE GROWTH INSIDEONE (1) CONCRETE SEAWATER INTAKE PIPE AT E STATION, HAVING A DIAMETER OFDN 2500 MM AND A LENGTH OF APPROXIMATE LY 750 METERS, INCLUDINGASSOCIATED INTERMEDIATE MANHOLES AS REQUIRED FOR ACCESS.1.2 CLEANING REQUIREMENTS1.2.1 CARRY OUT COMPLETE ME CHANICAL CLEANING OF MARINE GROWTH ALONG THEFULL INTERNAL CIRCUMFERENCE (360°) OF THE INTAKE PIPE.1.2.2 REMOVE MARINE GROWTH SUCH AS BARNACLES, SHELLS, ALGAE, AND OTHERBIOLOGICAL FOULING ATTACHED TO THE PIPE SURFACE.1.2.3 OPEN INTERMEDIATE MANHOLES AS REQUIRED TO FACILITATE CLEANINGACTIVITIES AND REINSTATE THEM TO ORIGINAL CONDITION AFTER COMPLETION.1.2.4 REMOVE ALL MARINE GROWTH 1 EA AND DEBRIS FR OM THE PIPELINE AND ENSUREPROPER DISPOSAL AT APPROVED LOCATIONS IN ACCORDANCE WITH ENVIRONMENTALREGULATIONS.1.3 WASTE MANAGEMENT1.3. 1 ENSURE ALL REMOVED MARINE GROWTH AND WASTE MATERIALS ARE STORED,HANDLED, TRANSPORTED, AND DISPOSED OF RESPONSIBLY.1.3.2 TRANSFER W ASTE ONLY TO AUTHORIZED AND LICENSED ENTITIES.1.3.3 MAINTAIN PROPER WASTE HANDLING AND DISPOSAL DOCUMENTATION.1.4 PLANNING AND REPOR TING1.4.1 THE WORKS SHALL BE COMPLETED WITHIN A MUTUALLY AGREED PERIOD BASEDON AVAILABILITY OF UNITS AND EQUIPMENT.1.4.2 SUBMIT A DE TAILED WORK PROGRAM INCLUDING A BAR CHART SCHEDULE INCONSULTATION WITH THE DEWA ENGINEER RESPONSIBLE FOR THE JOB.1.4.3 SUBMIT DAILY PROGRESS REPORTS AND A FINAL COMPLETION REPORT UPONCOMPLETION OF THE WORKS.2.0 FACILITIES BY CONTRACTORTHE CONTRACTOR SHALL PROVIDE ALL NECESSARY TRANSPORT, TOOLS, DIVINGEQUIPMENT, AND OPERATIONAL FACILITIES REQUIRED FOR EXECUTION OF THEWORKS, INCLUDING BUT NOT LI MITED TO:2.1 ONE PROPERLY CERTIFIED AND PERMITTED BOAT EQUIPPED WITH REQUIREDSAFETY EQUIPMENT AND COMMUNICATION DEVICES.2.2 COMPLETE DIVING EQUIPMENT, SAFETY GEAR, UNDERWATER COMMUNICATIONSYSTEMS, AIR PACKS, AND CHARGING FACILITIES.2.3 NECESSARY CLEANING TOOLS AND UNDERWATER EQUIPMENT REQUIRED TO CARRYOUT MARINE GROWTH REMOVAL.2.4 SUITABLE LIFTING ARRANGEMENTS AND HAND TOOLS REQUIRED FOR HANDL INGMANHOLE COVERS AND RELATED COMPONENTSFOR MORE INFORMATION AND DETAILS PLEASE CONTACT:MAJID.ALRAIS MAJID.ALRAIS@DEWA.GOV.AE SPECIAL NOTES / INSTRUCTIONS: E-station Sea water intake line cleaning for more information and details please contact: majid.alrais majid.alrais@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600594)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109990893
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.