|
Supervision Of Construction Work - Performing The Function Of Contract Engineer As Part Of The Investment Construction Of A Road For Pedestrians And Bicycles Along The Provincial Road No. 867 Sieniawa - Hrebenne As Part Of The Project Called New Quality Of Roztocze - Development Of Tourist Products Increasing The Potential Of Active Tourism In Roztocze. Description Of The Subject Of The Order Performing The Function Of Contract Engineer As Part Of The Investment Construction Of A Road For Pedestrians And Bicycles Along The Provincial Road No. 867 Sieniawa - Hrebenne As Part Of The Project Called New Quality Of Roztocze - Development Of Tourist Products Increasing The Potential Of Active Tourism In Roztocze On Design Work/Construction Works/Services Regarding: 1. In The Scope Of Design Documentation: • Preparation Of Design Documentation (Construction Design, Technical Design, Implementation) Based On The Documentation Included In The Swz, • Obtaining Or Updating/Extending Technical Conditions And Obtaining Any Other Technical Conditions/Decisions/Permits/Agreements, • Obtaining A Decision On Environmental Conditions In Accordance With Applicable Standards And Regulations, • Obtaining A Water And Legal Permit Decision In Accordance With Applicable Standards And Regulations, • Obtaining A Zrid Decision With Immediate Enforceability Or Obtaining An Effective Notification For Works That Do Not Require A Construction Permit, • Positive Approval Of The Design Documentation By The Ordering Party And By The Relevant Operators And Network Administrators (Agreement Confirmed In A Letter By The Network Operator), • Development, Obtaining All Necessary Opinions, Arrangements And Approval Of The Temporary Traffic Organization Project And The Permanent Traffic Organization Project, • Development Of The Bioz, Pzj Plan, Technological Designs And Other Documents Necessary To Start And Carry Out Construction Works. • Obtaining The Natura 2000 Declaration, Water Declaration (In Accordance With The Act And Requirements) • Developing The Project Information Card(S) • Preparing The Environmental Impact Report (If Necessary) Along With The Required Annexes 2. In The Scope Of Construction Works: As Part Of The Order, The Contractor Is Responsible For Supervising The Construction Of A Pedestrian And Bicycle Road Along The Provincial Road No. 867 Sieniawa - Hrebenne On The Section Of Approximately 11.575 Km, From Km 45+618.29 To Km 57+193.29, Including The Construction And Reconstruction Of Technical Infrastructure, Buildings And Construction Equipment. The Scope Of Construction Works Includes In Particular: - Construction Of A Road For Pedestrians And Bicycles With A Width Of Min. 2.5 M, - Reconstruction, Construction Of Exits From Dw867, - Construction Of Drainage Devices, - Construction Of Culverts Under The Road For Pedestrians And Bicycles, - Reconstruction Of Conflicts With External Infrastructure, - Construction Of Road Signs And Safety Devices, - Construction, Reconstruction Of The Power Grid - Construction, Reconstruction Of The Telecommunications Network; - Construction, Reconstruction Of Storm Sewage - Construction, Reconstruction Of The Gas Network - Construction, Reconstruction Of Street Lighting - Cutting Down Trees And Bushes, Clearing Of Tree Trunks And Compensatory Plantings, - Securing The Existing Land Utilities Networks - Construction Of A Technological Canal - Other Preparatory, Auxiliary And Tidying Up Works - Possible Construction Of Environmental Protection Devices Resulting From The Issued Environmental Decision
|