|
1. The Subject Of The Order Is A Service Consisting In Carrying Out A Technical Assessment Of Selected Emergency Shelter Places (Mds) In The City Of Zamość, The List Of Which Is Specified In Annex No. 9 To The Swz. 2. Expert Opinions On Places Of Emergency Shelter Are Aimed At Assessing The Condition And Suitability Of Facilities That Can Be Used As Shelter In Emergency Situations. When Performing The Service, The Contractor Must Take Into Account The Provisions Of: A) The Act Of December 5, 2024 On Civil Protection And Civil Defense (Journal Of Laws, Item 1907), B) The Regulation Of The Ministry Of Interior And Administration Of February 21, 2025 On The Criteria For Recognizing Buildings Or Parts Thereof As Protective Structures (Journal Of Laws, Item 235), C) The Regulation Of The Ministry Of Interior And Administration Of April 14, 2025 On The Central Register Of Civil Protection And Civil Defense Resources (Journal Of Laws, Item 493), D) Regulation Of The Ministry Of The Interior And Administration Of July 9, 2025 On The Conditions For Organizing And Requirements To Be Met By Places Of Emergency Shelter (Journal Of Laws, Item 932), E) Regulation Of The Ministry Of The Interior And Administration Of July 1, 2025 On The Method Of Preparing A Collective Protection Facility For Use, Detailed Conditions For The Operation Of Protective Structures, Ensuring Order Within Them And Their Necessary Equipment (Journal Of Laws, Item 933), F) Regulation Of The Council Of Ministers Of July 31, 2025 On Detailed Conditions For Designating Public Utility Buildings In Which Protective Structures Are Provided (Journal Of Laws, Item 1070), G) Resolution Of The Council Of Ministers Of May 27, 2025 On The Approval Of The Civil Protection And Civil Defense Program For The Years 2025-2026 (M.P. Of 2025, Item 541).3. The Expert Opinion Includes: A) Assessment Of The Technical Condition, I.E. Checking The Load-Bearing Capacity Of The Structure, The Condition Of The Installation, Protection Against External Factors, B) Adaptation To The Needs, I.E. Determining Whether The Facility Meets The Requirements Regarding The Number Of People It Can Accommodate, Access To Water, Toilets, Ventilation, C) Adaptation Procedures, I.E. Determining The Scope Of Work Needed To Adapt The Facility To The Role Of A Shelter, E.G. Strengthening The Structure, Installing Additional Devices, D) Adaptation Costs, I.E. Estimating The Financial Outlays Needed To Adapt The Facility.4. The Service Will Be Performed In Accordance With The Description Of The Subject Of The Order, The Requirements Contained In The Draft Contract Constituting Annex No. 8 To The Swz, The Principles Of Technical Knowledge And The Act Of July 7, 1994 - Construction Law (Journal Of Laws Of 2025, Item 418, As Amended).5. The Contractor Is Obliged, In Accordance With Art. 100 Paragraph 1 Of The Public Procurement Law, To Ensure That The Requirements Regarding Accessibility For Disabled People Or Design For All Users Are Tak
|