|
Cadastral Planimetric Topographic Survey, Planitimemetric Topographic Survey (Plots, Basins) Inc. Registration Of Existing Buildings - Over 10,000M², Cadastral Planimetrical Survey Of Urban Roads, Cadastral Planialtimetric Survey Of Rural Roads Including Cross Sections, Registration Of Lots (Land And Construction), Collection Of Documentation, Photographic Report With 3 Photos, Data Processing, Design And Presentation, 04/12/2025 - 13:32:19, 04/12/2025 - 13:32:22, 04/12/2025 - 13:32:24, 04/12/2025 - 13:32:27, Final Survey Report, Absorption Test, Cbr Test, Percussion Survey, Pick Survey, Granulometry For Sieving, Liquidity Limit, Plasticity Limit, Normal Proctor Compaction, Issuance Of A Technical Report On Deposit Characterization, Geophysical Study, Digger Type Manual Auger Survey - Diameter Up To 12, Including Report, Excluding Transportation, Mobilization By Service Order, Preparation Of A Maintenance Program Necessities, Preliminary Architectural Studies, Architectural Survey (Existing Buildings) And Diagnosis Of State Of Conservation In Common Use Buildings, Executive Architectural Project (Based On The Basic Project In New Buildings) In Common Use Buildings, Urban Planning Along Roads And Sidewalks With Accessibility Urban Planning, Urban Planning In Squares And Parks, Executive Architectural Project Of Hospitals, Laboratories, Inpatient Clinics, Radio And Tv Studios, Theatres, Cinemas., Executive Architectural Project For Industries, Sports Gymnasium, Indoor Swimming Pools, Industrial Kitchens, Service Stations., Executive Project For Courts, Boardwalks, Cemeteries, Free Areas For Recreation, Fairs And Exhibitions., Accessibility Project, Visual Communication Project Urbanistica, Preparation Of A Sanitary Landfill Project For A Population With Up To 70,000 Inhabitants, Electronic Animation (Video) With A Minimum Duration Of 40 Seconds, Concrete Structure (Superstructure Only), Concrete Structure (Foundation Only), Containment/Retaining Structure, Steel/Aluminum/Wood Structural Project Including Foundations, Structural Project - Structural Recovery With Reinforcement. Note: Calculation Based On The Worked Area, Hydraulic Installations, Sanitary Installations, Waterproofing Project, Rainwater, Air Conditioning Drains, Electrical Installations, Fire Project For Common Spaces, Fire And Panic Prevention And Fighting Project - Fire Extinguisher. Note: Approved By The Fire Department., Fire And Panic Prevention And Fighting Project - Fire Extinguisher+ Hydrant. Note: Approved By The Fire Department, Sdai (Fire Detection And Alarm System), Spda (Atmospheric Discharge Protection System), Hydraulic Installations Project In Urbanizations And Squares, Electrical Project - Special Buildings (With Generator And Substation). Note: Hospitals, Factories, Penitentiaries, Enterprises Of Greater Complexity., Electrical Project - Artistic Lighting (Luminotécnica). Note: Calculation Based On The Worked Area Of The Facade., Project Of Electrical Installations And Public Lighting In Urbanizations And Squares, Photovoltaic Solar Energy Project, Grouped Measurement Project, Air Conditioning: Air Conditioning And Mechanical Exhaust, Complex Air Conditioning Project. Note: System With Power Plants, Fan-Coils, Chiller, Pipeline Network, Etc., Liquefied Petroleum Gas (Lpg), Medicinal Gases And Special Gases, Sheltered Substation, Project
|