Project Detail |
The scope of the project consists of the renovation of the Terminal 1 complex, electrification of airport ground handling operations and other decarbonisation measures. Works consist of: i) renovation of Terminal 1 services building; ii) renovation of the utilities equipment and plants in Terminal 1, in operation since 1972, iii) installation of electric vehicle charging points in the airside area; iv) acquisition of a fleet of electric ground handling equipment and (airside) vehicles; and v) replacement of existing lighting systems by LED lighting in buildings and on the aircraft parking apron, and vi) installation of photovoltaic panels.
Objectives
Upgrade of existing infrastructure and utility networks and contribution to the companys decarbonisation plan, aiming to decrease carbon emissions to reach the "Net Zero" Emissions by the end of 2045.
Sector(s)
Transport - Transportation and storage
Proposed EIB finance (Approximate amount)
not disclosed
Total cost (Approximate amount)
not disclosed |