To improve the reliability and capacity of power transmission network in Southern Chattogram and Kaliakoir region of Bangladesh.
DESCRIPTION
The project comprises the construction of around 180.43 kilometers (km) 132/230kV transmission line, four gas-insulated switchgear (GIS) substations, and two bay extensions in Southern Chattogram region (i.e., Anwara, Cox’s Bazar, Teknaf) of Chattogram division, and Kaliakoir region (Bangabandhu Hi-Tech City (BHTC)) in Gazipur district of Dhaka division. The Government of Bangladesh (GoB) has undertaken this project to develop grid interfacing infrastructure to ensure efficient and uninterrupted power transmission in the project areas. Project activities include:
Construction of four substations with a total capacity of approximately 1,820 megavolt-amperes (MVA) at BHTC, Anwara, Coxs Bazar (North), Teknaf, and two bay extensions at the existing Kaliakoir Substation; and
Construction of approximately 180.43 km transmission line (in four segments): BHTC to Kaliakoir; Anwara to Coxs Bazar (North); Coxs Bazar (North) to Teknaf; and Line-In-Line-Out (LILO) at Cox’s Bazar (North) substation from an existing line. |