The loan will finance the construction of a new 2x2 lanes S19 expressway between Bialystok and Lublin on a 101 km long section between the S19 interchange with A2 motorway and Lublin. The project follows up the recently completed S19 expressway section between Lublin and Rzeszow, co-financed by the Bank. Works include new construction and extension of the existing infrastructure. The project design foresees construction of approximately 87 km of a 2x2 lane expressway, partially along the existing alignment of National road DK19 and partially along a new alignment, and a second two lane driveway (approximately 14 km) on the two existing bypass sections. The project scope also includes the construction of grade separated interchanges, animal crossings, drainage systems, noise protection screens, local and service roads and passenger service areas.
Objectives
The project is located north of Lublin in Lublin voivodeship (Lubelskie) on a north - south road corridor between Bialystok and the Polish - Slovakia border via Rzeszow. The corridor is running along the eastern border of Poland with Belarus and Ukraine and therefore is strategically important in the context of the ongoing war in Ukraine. The project will contribute to improved accessibility in the eastern Poland region by adapting of the technical and operational parameters of the road to the forecast traffic level, removing bottlenecks and completing the missing segments of the entire S19 expressway. This will improve international and local traffic flow organization and driving conditions on the corridor, which is particularly important for Ukraine transit traffic. It will also contribute to improved traffic safety and living conditions for inhabitants alongside the existing National Road DK19.
Sector(s)
Transport - Transportation and storage
Proposed EIB finance (Approximate amount)
EUR 400 million
Total cost (Approximate amount)
EUR 979 million |