Project Detail |
Tavantolgoi thermal power plant will meet the environmental requirements set by the World Bank, will be a power plant with low water consumption, no toxic chemical waste, low negative impact on the environment, and the introduction of new technologies.
Project development:
Tavantolgoi Thermal Power Plant is an environmental project set by the World Bank
meeting the requirements, low water consumption, no toxic chemical waste, nature
electricity with low negative impact on the environment and new technology
will be a station. The following activities will be carried out within the framework of the project development. It includes:
1. Thermal with a capacity of 300MW in two units in Phase I of the project
commissioning of the power plant and capacity of the plant in Phase II
Increase by +150MW.
Connecting to the "Tavantolgoi" substation of the central regions integrated network
21 km of 220 kV transmission line and 130 km of transmission line connected to Oyutolgoi mine
put into use.
3. An additional source of water for the station forms the reserve and water for the use of the station
supply buildings will be commissioned.
4. The residential campus for the station operation workers is put into operation
enter.
Social and economic significance of the project:
The Tavantolgoi thermal power plant was put into operation in Mongolia
social and economic development and positive impact on peoples lives
is an important project.
Thermal with two 300MW units to be commissioned in the first phase of the project
The power plant produces 2.3 billion kWh of energy per year in Mongolia
2.1 billion kilowatt-hours of electric power in the integrated network of the central region
supply. Tavantolgoi thermal power plant is a strategic deposit of Gobi region
places in the economic cycle, and they are domestic energy
120-140 million per year provided by the system and limiting the consumption of imported energy
country and country, leaving the foreign exchange flow of US dollars domestic
34.5 million US dollars in taxes and fees will be collected annually in the local budget.
2,500-3,000 manpower with duplication during construction of the project
220 permanent jobs by participating in the construction work and putting it into use
new premises will be created. |