Project Detail |
Through stage II of the HPMP, the Government of Pakistan is proposing to achieve the 35 per cent reduction of HCFC consumption by 2020 through the phase-out of 80.55 ODP tonnes of HCFCs, consisting of: 66.29 ODP tonnes used as a foam blowing agent (i.e.,58.69 ODP tonnes of HCFC-141b, 4.89 ODP tonnes of HCFC-142b, and 2.76 ODP tonnes of HCFC-22); 7.39 ODP tonnes of HCFC-22 through the conversion of a locally owned air-conditioning manufacturing enterprise; and 6.88 ODPtonnes of HCFC-22 through continued implementation of phase-out activities in the refrigeration servicing sector initiated during stage I. |