Subscribe     Pay Now

Bhutan Project Notice - CAPACITY DEVELOPMENT FOR MONITORING OF HYDROPOWER PLANT SAFETY, FINAL PHASE


Project Notice

PNR 44803
Project Name CAPACITY DEVELOPMENT FOR MONITORING OF HYDROPOWER PLANT SAFETY, FINAL PHASE
Project Detail SHORT DESCRIPTION: Overall goal The implementation of the final phase of project ‘Capacity Development for Monitoring of Hydropower Plant Safety’ aims to secure the current hydropower generation capacity of 1,606 Megawatt (MW) as well as the functionality of future hydropower plants and ensure uninterrupted energy supply to over 160,000 households. It further aims towards maximizing the national revenue through export of electricity to India and to increase the contribution to national revenue from 10% in 2017 to 12% in 2023. The safeguarding and minimization of risks to existing hydropower plants through prudent foresight and early warning systems constitutes another key objective of the project which will contribute to ensuring the reliability of energy supply. The in-house capacity of the Druk Green Power Corporation (DGPC) on early detection and warning systems will be further strengthened through additional instrumentation and sustained monitoring of the safety of hydropower plants and underground structures so that risks which could cause catastrophic accidents are detected early and damages minimized. Expected results Output 1: Adequate instruments in critical structures of hydropower plants in place Output 2: Enhanced instrumentation and monitoring capacity Output 3: Provision of technical backstopping to 118 MW Tangsibji Hydro Energy Limited After completion of the final phase, DGPC will have a pool of 33 capacitated engineers in the field of instrumentation and monitoring of hydropower plants. Target group / Beneficiaries The primary target group is composed of a total of 105 persons (30 engineers from DGPC, 70 students and 5 lecturers): The target group is composed of: • 2 female surveyor/engineers from DGPC who will receive continued training in precision measurement and data analysis of settlement/ movement of civil and other structures; • 10 Civil Engineers (2 female engineers) at the Power Plants/Corporate Office who will be trained in carrying out day to day instrumentation and monitoring of geotechnical devices; • 1 engineer from DGPC who will undertake a master’s degree in Austria in Sustainable/ Renewable Energy System; • 2 engineers from DGPC who will undertake a master’s degree in Austria in Tunneling; • 15 engineers from DGPC who will be trained in the field of instrumentation and monitoring of hydropower plants; • 25 female & 45 male students, and 5 lecturers from the Royal University of Bhutan will be trained on hydropower construction, instrumentation and monitoring through workshops and seminars. Indirect Beneficiaries: Populations and wildlife habitats living along runoff areas downstream of hydropower plants shall benefit through such initiatives since the project aims to identify hazards like possible dam failure which may affect the land, natural habitat and properties. The project will allow observant monitoring of such hazards and enable counter measures to be taken. Activities The key interventions of the projects include: *) Review the performance and adequacy of instrumentations installed in various components of each of the power plant and submit findings and recommendations for improvement, augmentation and modernization; *) Assistance in identification, tendering and installation of equipment in line with defined technical specifications to re-established, refurbish and replace the required instrumentations. *) Capacity strengthening of DGPC engineers in the use of various instrumentations, data management/ regulation, sustainable/ renewable energy and tunneling. *) Validation and recommendation to geotechnical appraisals and design with regard to the ongoing construction of hydropower plants.
Funded By Austrian Development Agency (ADA)
Sector
Country Bhutan , Southern Asia
Project Value BTN 600,000

Contact Information

Company Name Gross National Happiness Commission - Royal Government of Bhutan
Web Site https://www.entwicklung.at/en/projects/detail-en/capacity-development-for-monitoring-of-hydropower-plant-safety-final-phase

Tell us about your Product / Services,
We will Find Tenders for you