Project Detail |
The project aims at enhancing and promoting the socioeconomics of Bosnia and Herzegovina through the improvement of transport connections between BiH and middle/eastern Europe, and increasing the efficiency of the road infrastructure along the road section (Nemila- Donja Gracanica) located north of Zenica Town, which is a vital section of the corridor Vc crossing BiH from North to south. It aims also at eliminating traffic bottlenecks, reducing vehicle-operating costs, saving travel time, reducing traffic accidents, and enhancing road links of the project area with the rest of the country.
Project Description The Project consists of the construction of road section Nemila-Donja Gracanica ,of the Corridor Vc Motorway, of about 17.70 km long, provision of required consultancy services and land acquisition. The section is divided into three sub-sections namely (i) Nemila – Vranduk; (ii) Vranduk- Ponirak; and (iii) Ponirak - Donja Gracanica. The road is a two-lane dual carriageway with width of 3.75 m per lane, emergency lanes 2.5 m and shoulders of 1.5 m, with a central reserve of 4.00 m
Doc:
https://www.kuwait-fund.org/en/web/kfund/project-information?p_p_id=projectsinformation_WAR_KFundPortletsportlet&p_p_lifecycle=0&p_p_state=normal&p_p_mode=view&p_p_col_id=column-4&p_p_col_count=1&_projectsinformation_WAR_KFundPortletsportlet_mvcPath=%2Fviews%2Fprojects-information%2FviewDetail.jsp&_projectsinformation_WAR_KFundPortletsportlet_projectId=5530&_projectsinformation_WAR_KFundPortletsportlet_backURL=%2Fen%2Fweb%2Fkfund%2Fproject-information%3Fp_p_id%3Dprojectsinformation_WAR_KFundPortletsportlet%26p_p_lifecycle%3D0%26p_p_state%3Dnormal%26p_p_mode%3Dview%26p_p_col_id%3Dcolumn-4%26p_p_col_count%3D1%26_projectsinformation_WAR_KFundPortletsportlet_mvcPath%3D%252Fviews%252Fprojects-information%252Fview.jsp%26_projectsinformation_WAR_KFundPortletsportlet_delta%3D25%26_projectsinformation_WAR_KFundPortletsportlet_keywords%3D%26_projectsinformation_WAR_KFundPortletsportlet_advancedSearch%3Dfalse%26_projectsinformation_WAR_KFundPortletsportlet_andOperator%3Dtrue%26_projectsinformation_WAR_KFundPortletsportlet_resetCur%3Dfalse%26_projectsinformation_WAR_KFundPortletsportlet_cur%3D2 |