PNR | 35676 |
Project Name | East-west Bank Bridge 2 (part of the Pasig-Marikina and River Manggahan Floodway Bridges Construction Project) |
Project Detail | Involves the construction of a 929 8 m (of which, main bridge 254 5 m). 4-lane (2-lanes per direction with 3m sidewalks), 3-span Steel Lohse Arch Bridge to connect East bank Dike Road and West bank Dike Road in Cainta, Rizal The proposed bridge will be between Legaspi Bridge and Barkadahan Bridge |
Funded By | Self-Funded |
Sector | Construction |
Country | Philippines , South Eastern Asia |
Project Value | PHP 3,176,250,000 |