Project Detail |
The project involves the construction of various flood management infrastructures such as dikes/revetments and flood gates, and conducting channel dredging among others Detailed description of the scope of works for each component: For Ambal-Simuay: • River widening and construction of parallel dikes along the river to the cut-off channel. • A new channel with a dike-to-dike width of 250 meters; • Dredging and excavation of an estimated 2.87 million cubic meters of materials to achieve the design river width, covering a total length of 11.2 kilometers; and • Construction of an 11 6- kilometer dike and a 9.1-kilometer dike along the left and right banks, respectively For Rio Grande de Mindanao • Channel dredging and construction of dikes, retaining walls and flood gates; • Dredging works covering a total length of 6 1 kilometers and an estimated volume of 7 87 million cubic meters of dredged materials; • Construction of the dikes and retaining walls with a total length of 25 kilometers; and • Installation of flood gates at every entrance or exit of the creeks connected to Rio Grande de Mindanao, with twenty three (23) flap gates. |