Project Detail |
Project Description • The Tanjung Jati B re-expansion is a BOT (Build, Operate and Transfer) project called Jawa-4 under the Indonesian 35GW power development plan. • Tanjung Jati B power plant complex is located on the north coast of Central Java near Jepara. • The new plant consists of two 1,000 MW (net) units designed for ultra-supercritical steam conditions. • Ultra-supercritical design improves power generation efficiency and reduces carbon dioxide emissions compared to traditional thermal power plant design. • The new units will be built adjacent to the existing Tanjung Jati Units 1 to 4 that have total capacity of 2,640 MW and provide about 11% of the total electricity in Java-Bali power grid. Services Owner’s Engineer Services including: • Project Management support including EPC contract administration and schedule control. • Engineering Design Review including USC boilers and turbines, Balance of Plant, Mechanical Installations, Electrical Installations including 500kV switchyard and inter-connection to PLN, Civil, Structural and Architectural Works. • Supervision of Construction Site Management. • Erection and Installation supervision including USC boilers, turbines, environmental controls, jetties, CW intakes and outfall and balance of plant. • Supervision of Commissioning and Performance Testing of the Plant. • Assistance in quality assurance and control and environmental monitoring for the project. |