Project Detail |
The 1,440 MW Combined Cycle Gas
Turbine Power Plant has 2 unit s of
GE-9 HA.02 gas turbines.
The Project will be located adjacent to
the existing Sultan lskandar Power
Station (SIPS) at Pasir Gudang,
Johor. The geographical Site is
located at approximately latitude 1°26
49.60"N and longitude 103°53
07.2"E. The Project Site falls under
the jurisdiction of the local council,
Majlis Perbandaran Pasir Gudang
(MPPG).
The Site is located approximately 40
km from Senai International Airport,
Johor. The Site is also located near
the two Johor seaports of Tanjung
Langsat Port and Johor Port. The Site
is accessible by roads and
expressways.
The project has Commercial
Operation around July 2020.
Services
Owners Engineering Services
· Project management support,
· Design review of the EPC
· Engineering designs
· Manufacturing inspection and
· Testing plans and
· Site services for the construction,
commissioning and testing
through to commercial operation.
· Warranty Period Services |