The 1,440 MW Combined Cycle Gas Turbine Power Plant has 2 unit s of GE-9 HA.02 gas turbines. The Project will be located adjacent to the existing Sultan lskandar Power Station (SIPS) at Pasir Gudang, Johor. The geographical Site is located at approximately latitude 1°26 49.60N and longitude 103°53 07.2E. The Project Site falls under the jurisdiction of the local council, Majlis Perbandaran Pasir Gudang (MPPG). The Site is located approximately 40 km from Senai International Airport, Johor. The Site is also located near the two Johor seaports of Tanjung Langsat Port and Johor Port. The Site is accessible by roads and expressways. The project has Commercial Operation around July 2020. Services Owners Engineering Services · Project management support, · Design review of the EPC · Engineering designs · Manufacturing inspection and · Testing plans and · Site services for the construction, commissioning and testing through to commercial operation. · Warranty Period Services |