Project Detail |
On the basis of a contract with the Roads Department of Georgia, State Construction Company Ltd carries out the rehabilitation works of Zugdidi-Jvari-Mestia-Lasdili Interstate km165-km177 (Project No. 220 + 00-Total 350 + 00) .
The project envisages rehabilitation of 13 km section. Arrangements will be made for the ground clearance, metal pipes and reinforced concrete rectangular pipes , the existing bridges will be repaired, the upper and lower support walls with gabion boxes will be arranged, as well as the shore wall. of the road surface will be changed completely within the ground and will be reinforced cement concrete cover of 79718 m 2Roadside, yard entrances (7pcs), accessions (10pcs), bus stop and car park will also be arranged. Traffic signs (199pcs), plastic bollards (758pcs) will be installed for safe traffic, horizontal marking of the driveway, road restraint with steel rails (7140ft / m) and road restraint with curved bars (384ft).
The deadline for completion of works is December 05, 2019.
Financing: The project cost is 14 754 210 GEL. |