The "Regional Hydropower Plant Rusumo Falls" project was jointly developed by Burundi, Rwanda, and Tanzania. It includes the construction of a hydropower plant as well as the construction of 387 km of high-voltage lines and associated substations in the three countries (the present project).
In Rwanda, services include detailed design and works supervision for the following:
a 220 kV double-circuit transmission line of 119 km length, with one circuit strung, from the hydropower plant to the existing Shango substation (twin conductors, galvanized shieldwire and one OPGW on lattice steel towers);
a new 220/30 kV substation at the new Bugesera International Airport and extension of the existing 220 kV Shango Substation.
intecs services
intec contributes to the following tasks:
Review of transmission line routes, angle towers and substation locations
Detailed design
Elaboration of technical specifications and tender documents
Review of Contractors design and drawings
Monitoring and supervision of works
Factory acceptance testing and inspection of material and equipment on site
Commissioning of equipment
Reporting. |