Rwanda Project Notice - Hydropower Plant Rusumo Falls - Transmission Line Component (Rwanda Part Of The Regional Burundi - Rwanda - Tanzania Project)


Project Notice

PNR 31299
Project Name Hydropower Plant Rusumo Falls - Transmission Line Component (Rwanda part of the regional Burundi - Rwanda - Tanzania project)
Project Detail The "Regional Hydropower Plant Rusumo Falls" project was jointly developed by Burundi, Rwanda, and Tanzania. It includes the construction of a hydropower plant as well as the construction of 387 km of high-voltage lines and associated substations in the three countries (the present project). In Rwanda, services include detailed design and works supervision for the following: a 220 kV double-circuit transmission line of 119 km length, with one circuit strung, from the hydropower plant to the existing Shango substation (twin conductors, galvanized shieldwire and one OPGW on lattice steel towers); a new 220/30 kV substation at the new Bugesera International Airport and extension of the existing 220 kV Shango Substation. intecs services intec contributes to the following tasks: Review of transmission line routes, angle towers and substation locations Detailed design Elaboration of technical specifications and tender documents Review of Contractors design and drawings Monitoring and supervision of works Factory acceptance testing and inspection of material and equipment on site Commissioning of equipment Reporting.
Funded By African Development Bank (AfDB)
Sector Energy & Power
Country Rwanda , Eastern Africa
Project Value Plz Refer Document

Contact Information

Company Name Energy Development Corporation Limited (EDCL), Rwanda Energy Group Limited (REG)
Address KN 82 st 3 | PO Box 537 Kigali www.reg.rw +(250)(0)788181224 Toll free: 2727