Project Detail |
Since 2007, SECO, together with other international donors, has been financing the Ghana Energy Developing and Access Program (GEDAP) which is hosted by the Ghana Ministry of Energy and Petroleum (MoEP) and aims at improving the efficiency of power distribution in Ghana and at increasing access to electricity by the population. The third phase of the programme (GEDAP III) has started in September 2014. Its focus is to increase electricity access through 1) financing electricity distribution infrastructure, 2) renewable energy development and energy efficiency, and 3) institutional strengthening. To support project implementation, SECO has contracted a "backstopper" who will carry out the tasks specified below.
intecs services
Inception Study
Preparation of an inception study recommending main measures to be implemented during the project
Technical Support
Review of strategic documents on the energy sector
Preparation of feasibility studies of proposed technical and institutional strengthening measures (wind, solar, hydropower, biomass)
Expert opinion on technical options, review of and comments on project reports and technical documents
Punctual technical support and comprehensive input to SECOs Project Completion Note
Procurement
Support to project procurement measures, incl. review of tender documents and procedures
Expert opinion on submitted bids
Monitoring
Assistance to the GEDAP Secretariat and SECO in monitoring the implementation of the project
Annual controlling missions to monitor project results against the logframe targets and objectives |