Project Detail |
DESCRIPTION On December 1, 2018 there was a change of government at the federal level in Mexico, therefore all those projects that are in the preinvestment stage are subject to confirmation by the new authorities. Construction, operation and maintenance of the Wastewater Treatment Plant (WWTP) of the New International Airport of Mexico (NAIM) for an average daily cost of 75.88 l / s. The WWTP will treat all of the wastewater generated at the airport. The quality of the water will comply with the requirements of Title 22 of California (superior to NOM-003-SEMARNAT-1997). The treated water will be used for the cooling tower, toilets (toilets and urinals) and irrigation. The project has the following characteristics: Type of system: separate, since the sanitary discharges will be conducted by an independent collector to the pluvial system. Pouring system: gravity (pipe line between logs and wells) and pressure (discharge from pumping stations to general network). Final disposition : homogenization tank - Treatment Plant A constructed area of ??7,412.5 m2 is foreseen. Considering the following areas that make up the WWTP: General warehouse Sludge area Office area Filtration process area Electric pump room Two aerobic process modules Two treated water storage tanks Homogenizer tank There is an executive project. This project belongs to the NAIM Macroproject. |