Project Detail |
DESCRIPTION
On December 1, 2018 there was a change of government at the federal level in Mexico, therefore all those projects that are in the preinvestment stage are subject to confirmation by the new authorities.
Design, construction, equipment and installation of:
- 1 electrical substation with a total capacity of 30 MVA, voltage ratio of 115 / 13.8 kV.
- 2 km-c (kilometers circuit) of high voltage line at 115 kV for interconnection.
- 1 1.8 MVAr capacitor at the voltage level of 13.8 kV.
- Terminal equipment for interconnection. |