Scope of work: • Tunnelling: Breakthrough for two diagonal tunnels between existing and new tunnel in Arna • Back-ripping (enlargement of profile) for fans in the tunnel ceiling in Fløen • Dismantling of existing PE-foam • Back-ripping for new water and frost proofing at different locations through- out the tunnel • Replacement of existing PE-foam, fireproofing with shotcrete • Supplementary work in cross passages (blasting/road heading/cable ducts) • Installation of bolts for signs and fans • Maintenance/adjustment of existing drainage system, emergency lighting and cable ducts • Planned tendering is 2020 and start-up spring 2021. Project Nygårdstangen-Bergen-Fløen The distance from Fløen to Bergen railway station and the freight terminal at Nygårdstangen is 1.3 km. The project has a high complexity due to limited space in the city centre, and coordination with other projects in the same area. Bane NOR is reviewing the scope and the progress plan of the project. Tendering of contracts is estimated to 2020. Bergen-Fløen • New double-track from Fløen to Bergen railway station • Optimalisation of track layout • New electronic interlocking system Nygårdstangen/Bergen freight terminal • Reconstruction and upgrading/ optimalisation of the freight area • Building new track • New freight buildings |