Project Detail |
This project is open to financing proposals for its
execution
• Execution period: 3 years. Start: 2020
Description
• With the implementation of this project it is expected to promote the activity
commercial and tourist in the area of ??the Gulf of Fonseca, and the country in general,
through the Reactivation of the port terminal of Potosí and operation of a
ferry system.
• The works to be carried out are described below:
• Pier type breakwater with pre-reinforced concrete elements, with a length of
250 meters and cross section of 9.10 meters. Operable at high and low tide.
• Vehicle circulation of 7.30 meters wide and pedestrian footbridge of 1.20
meters.
• -Tilt-up metal frame 10 meters long and 8.5 meters wide.
• Navigation channel of approximately 1,000 meters in length and section
cross section of 60 meters at the bottom of the canal.
• -2 Ferris of 134m of length, 20 meters of beam, 5.50 meters of draft
[Disclaimer: The Above text is machine translated in English from Original Language of Project Document. For accuracy of content of Project please Refer the Original Project Notice link or in original Language Project Notice as per below]
http://www.enatrel.gob.ni/wp-content/uploads/2019/01/Politicas_y_proyectos_nacionales_para_potenciar_la_inversion_en_Nicaragua.pdf
http://www.enatrel.gob.ni/wp-content/uploads/2019/01/Anexos-_Politicas_y_proyectos_nacionales_para_potenciar_la_inversion_en_Nicaragua.pdf |