Appalachian Power and its affiliate, AEP West Virginia Transmission Co.Inc., plan to upgrade the electric transmission grid in Fayette and Raleigh counties. The Bradley – Scarbro Transmission Line Project includes rebuilding 8 miles of transmission line, upgrading existing substations, and retiring a substation. These upgrades will strengthen the system and reduce the likelihood of power outages. Construction is expected to begin Fall 2019 and be completed Summer 2021.
TYPICAL STRUCTURES
Appalachian Power will use various types of
galvanized steel single-circuit structures
depending on terrain and other factors. The
majority of the structures will be H-frames
and/or lattice tower structures.
Structure Height: Approximately 75 feet
Right-of-Way Width: Approximately 100 feet
Appalachian Power carefully balances the
energy needs of its customers while protecting
the environment and natural beauty of the
region. |