Project Detail |
The Project consists of the construction of Luoyang City’s first urban rail line (Line 1). NDB will finance Equipment for Line 1, which includes the equipment necessary to operate Line 1, such as rolling stock, power supply, control system, signaling system, communication system, monitoring system, fare collection system, safety and security system, ventilation and air conditioning system, water supply, sewerage and fire protection system and station auxiliary equipment.
The metro will connect the residential areas to the city center and provide easy access to public services, business, commercial centers and cultural sites. It will enable (i) increased transport capacity, thus easing congestion on existing roads, (ii) faster commute and improved mobility, (iii) enhanced comfort, safety and reliability of traffic in the city, (iv) improved connectivity contributing to a balanced city spatial development, and (v) more robust socio-economic development of Luoyang. |