1509 MW natural gas fired IPP for a concession of 15 years under develop, finance, design, engineer, construct, own, operate and maintain structure. Natural gas will be the primary fuel for electricity generation, with fuel oil used as a back-up option. KEY FACTS FUEL Natural Gas LOCATION Ibri, Oman OFFTAKER OPWP POWER 1509 MW, CCGT TECHNOLOGY CCGT PROJECT COST USD 967 Mn COMMERCIAL OPERATIONAL DATE Q2 2019 ACWA POWER SHARE 44.90% OFFTAKE CONTRACT PPA-BOO 15 years OTHER INVESTORS Mitsui (50.1%), DIDIC (5%) EPC SEPCO III & Power China O&M Dhofar O&M Co (Subcontracted to NOMAC) |