Project Detail |
The scope of the project comprises: a covered four-span footbridge system at the junction of Sham Mong Road and Tonkin Street West, with length of each span ranging from about 46 metres (m) to 67 m (235 m long in total) and the clear width ranging from about 4.0 m to 4.7 m; six lifts, four covered escalators, two covered staircases and three direct connections linking the proposed footbridge system with future adjacent developments; associated road works and ancillary works including a temporary covered staircase, footpaths, drainage, utilities, electrical and mechanical and landscaping works; and necessary environmental mitigation measures. Contract No. KL/2016/01 Scope: Same as project scope above Commencement Date: 28 September 2016 Completion Date: Q3 2019 Contract Sum: About $222 million Contractor: Wang Kee Construction Company Limited |